Mobile access platforms from China pay 4% UK duty, and since 20 August 2026 boom lifts also face provisional anti-dumping duty: 71.74% for exporters not named in the case, with individual rates for named producers that need a signed invoice declaration. Excavator buckets and similar parts pay 0%. Cambridge China Bridge sources access platforms and machinery parts with the duty worked out first.
Chinese boom lifts now face a provisional UK anti-dumping duty of up to 71.74% on top of 4%. What the case covers, and the machinery rules for access platforms.

A new anti-dumping case on boom lifts
The Trade Remedies Authority opened case AD0075, boom lifts from China, on 19 December 2025, with a parallel subsidy case, AS0076, and published a provisional determination on 19 August 2026. Read from the UK Trade Tariff on 25 September 2026, provisional anti-dumping measures on China applied from 20 August 2026 to mobile access equipment codes and their sections and parts, with an end date of 20 February 2027 on the provisional measure.
The rate depends on the exporter. Goods from producers not named in the case carried 71.74% on top of the ordinary duty; named producers have their own additional codes, and the tariff makes the individual rate conditional on a commercial invoice carrying a signed declaration that the named company produced the goods. Without that declaration the 71.74% residual applies. Goods outside the case description are declared under an exclusion code at 0%. Check the case file and the tariff for the exact model before any order.
| Goods | Commodity code | Duty | Anti-dumping duty on China |
|---|---|---|---|
| Electric self-propelled mobile access equipment for lifting persons, working height 6 m or more | 8427 10 10 10 | 4% | Provisional: 71.74% residual, individual rates for named producers |
| Other self-propelled mobile access equipment for lifting persons, working height 6 m or more | 8427 20 19 10 | 4% | Provisional: 71.74% residual, individual rates for named producers |
| Pre-assembled sections of self-propelled mobile access equipment | 8431 39 00 10 | 0% | Provisional: 71.74% residual, individual rates for named producers |
| Buckets, shovels, grabs and grips for excavators and loaders | 8431 41 00 90 | 0% | None |
| Bulldozer or angledozer blades | 8431 42 00 00 | 0% | None |
| Other parts of excavators and earthmoving machinery | 8431 49 80 90 | 0% | None |
Access platforms are high-risk machinery
The Supply of Machinery (Safety) Regulations 2008 list, at item 17 of Annex IV, devices for the lifting of persons or of persons and goods involving a hazard of falling from a vertical height of more than three metres. Annex IV machinery follows a special conformity assessment route, so ask the factory which route it used, who the approved body was, and for the certificate and declaration for the exact model and configuration you are buying.
In use, the Lifting Operations and Lifting Equipment Regulations 1998 require lifting equipment for lifting persons to be thoroughly examined at least every six months, or under an examination scheme. A hire fleet or contractor buying platforms needs the manuals, load charts and the information an examiner will ask for, in English, from the first delivery.
Earthmoving parts
Buckets, blades, teeth and track parts carry no duty and no anti-dumping measure, and they are a large category because they wear out. The quality questions are the steel grade and hardness of wear parts, the weld procedure and inspection on buckets, and the fit to the machine: a bucket is bought for a specific coupler and pin size, so give the factory the machine model and the coupler drawing.
Ask for material certificates and hardness readings, and check welds and dimensions at inspection before the parts are painted. The custom metal components guide covers drawings and tolerances.
Planning the order
For access equipment the duty now decides the supplier as much as the price: a named producer with a valid invoice declaration and a producer outside the case can differ by the whole residual rate. Work out the landed price for each candidate factory, and keep the declaration requirements in the contract.
Cambridge China Bridge sources access platforms, earthmoving parts and machinery sections: we check the case and the tariff for the exact product, confirm the conformity assessment and the documents, and inspect before shipment. See how our sourcing service works.
Frequently asked questions
Is there anti-dumping duty on boom lifts from China?
Yes. Read from the UK Trade Tariff on 25 September 2026, provisional anti-dumping measures from case AD0075 applied from 20 August 2026: 71.74% for exporters not named, with individual rates for named producers.
How does a named producer's lower rate apply?
The tariff makes it conditional on a commercial invoice with a signed declaration that the named company produced the goods. Without it, the 71.74% residual rate applies.
What is the UK duty on excavator buckets from China?
Read from the UK Trade Tariff on 25 September 2026, buckets, shovels, grabs and grips for excavators and loaders carried 0% duty from China, with no anti-dumping duty.
Which machinery rules apply to access platforms?
They are Annex IV machinery under the Supply of Machinery (Safety) Regulations 2008, item 17, and in use they need a thorough examination at least every six months under LOLER 1998.