Metal bird feeders classified under the relevant iron or steel lines pay 2% UK duty from China, with no rate variation between the listed candidates. Confirm the construction and commodity code; consumer feeders sold in Great Britain must be safe in normal or reasonably foreseeable use. Cambridge China Bridge sources metal bird feeders.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-05

Aisles of a large supermarket seen from above, shelves fully stocked

Duty depends on the feeder's construction

Heading 7326 covers other articles of iron or steel. Wire feeders and fabricated sheet-steel feeders have different candidate lines. The component rows below apply only where the manufacturing process and condition match their descriptions; they are not alternative codes for every finished feeder. Aluminium feeders need a separate classification.

Read from the UK Trade Tariff on 5 October 2026, the listed candidate lines carry 2% duty for goods from China, with no anti-dumping or countervailing duty recorded. The suspensions on the stamped and forged lines describe specialised goods, not ordinary feeder components. The residual finished-article line has no suspension and attaches torture-and-repression import and export controls. Confirm the linked descriptions and any declaration requirement with your customs broker; do not treat the heading-level flag as a ban on bird feeders.

Confirm the commodity code using photographs, materials and manufacturing details. Our pet products guide covers the wider range. Confirm with HMRC or your customs broker whether the UK carbon border adjustment mechanism will apply to your imports and include any applicable future obligation in your import planning.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 5 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Iron or steel wire articles, including suitable wire feeder designs7326 20 00 902%None
Other iron or steel articles, including suitable fabricated feeders7326 90 98 902%None
Stamped feeder components, not further worked, subject to classification7326 19 90 002%None
Closed-die forged feeder fittings, subject to classification7326 90 94 902%None

Specify mesh, drainage and cleaning access

Describe the intended feed: peanuts, seeds or fat balls. Agree mesh openings, feeding ports, perch shape, capacity, lid fastening and how the feeder hangs. Specify the steel grade, wire diameter or sheet thickness, weld locations and coating against an approved sample. Require access for emptying and cleaning, with drainage that remains open after coating.

For consumer feeders sold in Great Britain, the importer must ensure safety in normal or reasonably foreseeable use. Review sharp edges, detachable fittings and lid or hanger failure when filling and cleaning. Where reasonable, the product or packaging must identify the responsible producer by name and address and carry a product or batch reference.

Worked duty example

Illustrative example, not a quote: Illustrative order of 5,000 wire bird feeders under 7326 20 00 90, invoiced at £30,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £35,000. Duty at 2% is £700. Import VAT at 20% is charged on the customs value plus duty, £35,700, so it is £7,140. Import taxes total £7,840; a VAT-registered importer can usually reclaim the VAT, so the lasting cost is the £700 of duty. The import duty and VAT guide explains each step.

Inspection checklist

Mesh and edges: compare openings with the approved sample and check cut wire ends, seams and feeding ports for burrs.

Hanging assembly: load the feeder with its intended feed and check the hanger, lid catch, welds and any supplied bracket.

Drainage and cleaning: wet the sample, check that water drains, and empty and reassemble it without trapped feed.

Finish and identification: check coating coverage around welds and inside the base, rubbing in the carton, and agreed traceability details. Use the approved sample for inspection.

What goes wrong

A supplier can change mesh or wire thickness while keeping the same overall shape. Feed then escapes, filling becomes awkward, or the hanging assembly bends. Keep the approved sample and drawing together, and check production against both rather than accepting a catalogue photograph.

Coating can bridge drainage holes or miss weld recesses. Trapped water wets feed, exposed steel rusts, and loosely packed feeders scrape each other in transit. Inspect a packed sample as well as an unpacked feeder, and agree separators and protection for projecting perches.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification.

Frequently asked questions

What is the UK import duty on metal bird feeders from China?

The relevant candidate lines in the supplied tariff snapshot carry 2% duty. Confirm the finished feeder's code from its material and construction; no anti-dumping or countervailing duty is recorded.

Which code covers a steel wire bird feeder?

7326 20 00 90 is a candidate for other iron or steel wire articles. A fabricated sheet-steel feeder may instead fall under 7326 90 98 90. Confirm the complete product before declaring it.

What should I ask the factory to specify?

Ask for material, wire or sheet thickness, mesh openings, welds, coating, drainage, lid fastening and hanger details. Approve a sample filled with the intended feed and opened for cleaning.

What safety details belong on the packaging?

For Great Britain, allow traceability through the producer's name and address and a product or batch reference, where reasonable. Check the packaging artwork against the agreed feeder model.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. General product safety guidance for Great Britain
  3. Export controls: torture and capital punishment goods

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply within one working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote