Sector guides

Sourcing cine projector shutters from China

Cine projector shutter assemblies from China fall within projector parts when correctly classified, with a duty range of 0% to 0% in the supplied tariff snapshot. Workplace supply requires safe-use information and necessary safety checks. Cambridge China Bridge sources cine projector shutter assemblies.

Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-15

Illustration of a cinema projector rotating shutter assembly with three broad black fan blades mounted on a central spindle.
Illustrative image

Duty on cine projector shutter assemblies

Read from the UK Trade Tariff on 11 October 2026, heading 9007 covers cinematographic cameras and projectors and their parts. Projector parts under 9007 92 00 90 carry 0% duty from China. The supplied facts record no anti-dumping or countervailing measures and no suspensions. The table shows assembly configurations sharing this code, rather than separate tariff subdivisions.

The tariff snapshot attaches a DCMS Export Licence entry. Official guidance states that importing objects of cultural interest into Great Britain has no licensing requirement under that scheme. Ask your customs broker to confirm how the attached entry applies to your shipment, particularly for historic equipment or onward export.

Confirm the commodity code using drawings, the projector model and the exact supplied assembly. Include whether shafts, bearings or drive components are supplied separately. For related mechanisms within the wider heading, see cine projector intermittent movements.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 11 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Cine projector replacement shutter assemblies9007 92 00 900%None

Specify the shutter and its timing

Identify the projector make, model, film gauge and intended running speeds. Provide a drawing covering shutter diameter, blade count, blade angles, thickness, bore, keyway, mounting faces and rotation direction. Agree material, surface finish, balance acceptance and clearance to the housing. Define the assembly contents and timing reference against the intermittent movement.

For workplace supply, provide safe-use information and instructions, including subsequent revisions, and arrange the testing or examination necessary for safety compliance. Ask the factory for installation and timing instructions and recorded checks on blade retention. The worked order is illustrative; use the import duty and VAT guide for the calculation method.

Worked duty example

Illustrative example, not a quote: 20 cine projector shutter assemblies, illustrative only under 9007 92 00 90, invoiced at £2,500 free on board, with £900 of freight and insurance to the UK. The customs value is £3,400. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £3,400, so it is £680. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Fit: compare the bore, keyway, shaft seating and mounting faces with the approved drawing and a representative projector.

Blades: inspect for burrs, cracks, distortion and loose fasteners; check blade geometry and clearance through rotation.

Running: test in a guarded projector for vibration, rubbing and light leakage during film movement; check the timing reference.

Arrival: check corrosion, bent blades and displaced supports, then verify assembly contents and part identification. See quality inspection.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A shutter can fit the shaft yet have the wrong blade geometry or angular position. Light reaching the film during movement produces streaking, while poor balance causes vibration. Incorrect thickness or mounting offset can make the shutter rub the housing.

Approve a sample in the intended projector before releasing production. Agree drawing revision control and a packing arrangement that supports the hub without loading the blades. On arrival, check the assembly before fitting it; bent blades should not be accepted solely because the shaft still turns.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on cine projector shutter assemblies from China?

The supplied tariff snapshot gives projector parts under 9007 92 00 90 a duty of 0%, with no recorded anti-dumping or countervailing measures. Confirm that the supplied assembly belongs in this code.

Which dimensions should I send the factory?

Send the bore, keyway, mounting faces, blade diameter, thickness and angles, rotation direction and housing clearance, together with the projector model and timing reference.

Does the DCMS entry mean I need a GB cultural-goods import licence?

Official guidance says there are no licensing requirements for importing objects of cultural interest into Great Britain. Have your broker confirm the tariff entry for the shipment.

How do I test a replacement projector shutter?

Fit an approved sample in the intended projector. Check clearance, vibration and synchronisation with film movement, then inspect the projected image for streaking and uneven light.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Exporting or importing objects of cultural interest
  3. HSE: UK law on the design and supply of products

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote