Sector guides

Sourcing cine projector film sprockets from China

Cine projector film sprockets from China carry 0% UK duty under the projector-parts line, with no trade remedy recorded in the supplied tariff data. Importers remain responsible for product safety after placing goods on the market. Specify tooth geometry and shaft fit. Cambridge China Bridge sources cine projector film sprockets.

Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-15

Illustration of two machined cinema projector film sprocket wheels with evenly spaced fine teeth along both rims and a central shaft bore.
Illustrative image

UK duty on cine projector film sprockets

Read from the UK Trade Tariff on 15 November 2026, heading 9007 covers cinematographic cameras and projectors, with parts and accessories in its parts lines. Projector parts under 9007 92 00 90 carry 0% duty for goods from China. The supplied data records no anti-dumping or countervailing measure and no suspension. The table shows sprocket variants sharing this tariff line.

The supplied tariff data attaches a DCMS Export Licence control. Government guidance says there are no licensing requirements for importing objects of cultural interest into Great Britain. Ask your customs broker to confirm how the listed control applies to your shipment, particularly for historic replacement parts.

Send the broker a drawing, photographs and the intended projector application to confirm the commodity code. For complete equipment and the wider heading, see cine cameras and film projectors.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 15 November 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Feed sprockets for cine projectors9007 92 00 900%None

Specify the film teeth and shaft interface

Specify film gauge, perforation shape and pitch, tooth count, tooth profile, tooth-row spacing and the projector model. Define bore size, keyway or fixing arrangement, hub offset, material, surface finish and allowable runout on the drawing. A worn original can help establish fit, but should not be the sole reference for tooth geometry.

Approve a sample in the intended projector using expendable test film. Check engagement, loop stability and release from the teeth. For sprockets intended for or reasonably likely to be used by consumers, Great Britain's general product safety rules apply. Importers remain responsible for safety after placing products on the market.

Worked duty example

Illustrative example, not a quote: 20 replacement cine projector film sprockets; illustrative order, not a quotation under 9007 92 00 90, invoiced at £2,500 free on board, with £900 of freight and insurance to the UK. The customs value is £3,400. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £3,400, so it is £680. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Teeth: check profile and spacing against the approved drawing; inspect for burrs, sharp edges and damaged tips.

Mounting: measure the bore, keyway and hub offset; check seating and runout on the intended shaft.

Film transport: run expendable film through the assembled projector and inspect perforations for stretching, tearing or fresh marks.

Arrival condition: check corrosion, tooth damage and mixed variants; match package identification to drawings and inspection records. See quality inspection.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A sprocket may fit the shaft yet damage film because its tooth profile, spacing or alignment is wrong. Burrs can mark perforations, while poor concentricity causes uneven transport. Copying a worn sprocket can reproduce wear instead of the intended geometry.

Agree acceptance checks before production and keep the approved sample with its drawing. Inspect delivered parts before fitting them to a projector carrying valuable film. Keep different projector variants separately identified so a visually similar part is not installed in the wrong machine.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on cine projector film sprockets from China?

The supplied tariff data gives 0% for projector parts under 9007 92 00 90, with no anti-dumping or countervailing measure and no suspension recorded.

Can a factory copy my old projector sprocket?

Supply the original alongside a drawing and projector details. Establish the intended tooth geometry separately, because a worn original may give the factory the wrong profile.

How do I check whether a replacement sprocket damages film?

Test it in the intended projector with expendable film. Check tooth engagement, loop stability and release, then inspect the perforations for stretching, tearing and fresh marks.

Does the listed cultural-goods control mean I need an import licence?

Government guidance says cultural objects have no import licensing requirements into Great Britain. The supplied tariff lists an export-licence control; ask your broker to confirm its relevance to your shipment.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Exporting or importing objects of cultural interest
  3. General product safety regulations: Great Britain
  4. Product safety law: advice for manufacturers and importers

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote