Sector guides

Sourcing cine intermittent movements from China

Cine-projector intermittent movements classified as projector parts carry 0% UK duty from China, with no trade remedy listed. If an assembly qualifies as partly completed machinery, it needs assembly instructions and a declaration of incorporation. Cambridge China Bridge sources cine-projector intermittent movements.

Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-15

Illustration of an exposed cinema projector intermittent film transport movement showing a four-slot Geneva cross, drive pin and sprocket shaft on a metal base.
Illustrative image

0% duty on cine-projector parts

Read from the UK Trade Tariff on 15 November 2026, heading 9007 covers cinematographic cameras and projectors and their parts. Intermittent movements advance film between exposures and hold it stationary during projection. The table shows purchasing variants within the same projector-parts line, rather than separate tariff subdivisions.

For goods from China, projector parts under 9007 92 00 90 carry 0% duty. The supplied tariff data lists no anti-dumping or countervailing duty and no suspension. It attaches a DCMS Export Licence control. Official guidance says there are no cultural-object import licensing requirements for Great Britain; ask your customs broker to confirm how the attached control applies to your shipment.

Confirm the commodity code using drawings, the projector model and the supplied assembly's function. Do not assume loose general-purpose components share the assembly's classification. For related film transport parts, see cine-projector film sprockets.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 15 November 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Cased intermittent movement assemblies for cine projectors9007 92 00 900%None

Specify the movement and its projector interface

Specify the projector make and model, film gauge, rotation direction, mounting pattern, shaft dimensions, coupling and sprocket interface. Provide drawings and a reference assembly. Define whether the order includes the housing, bearings, seals, drive coupling and intermittent sprocket, and whether assemblies are newly manufactured or rebuilt.

Agree acceptance criteria for shaft play, backlash, indexing, dwell and picture steadiness. Ask for the lubricant specification, filling method and installation procedure. Test the sample in the intended projector with the shutter timing set correctly.

Establish whether the supplied assembly qualifies as partly completed machinery. If it does, assembly instructions and a declaration of incorporation should accompany it. Ask the supplier to explain the status of the exact assembly before ordering.

Worked duty example

Illustrative example, not a quote: 20 replacement intermittent movement assemblies, illustrative only under 9007 92 00 90, invoiced at £10,000 free on board, with £900 of freight and insurance to the UK. The customs value is £10,900. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £10,900, so it is £2,180. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Fit: compare mounting faces, shaft ends, couplings and sprocket position with the approved drawing and reference assembly.

Motion: rotate through the operating cycle and check indexing, dwell, backlash and binding before a powered trial.

Film: run test film in the intended projector and check picture steadiness, perforation damage and scratching.

Condition: check lubricant, leakage, bearing noise, corrosion protection and packing that protects exposed shafts. Record findings through quality inspection.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A movement can fit the mounting holes yet have the wrong shaft position, rotation or coupling. Excessive play can produce picture judder; binding, incorrect timing or a mismatched sprocket can damage film. A bench rotation video does not establish performance in the buyer's projector.

Approve an installed sample before accepting the batch. Keep the drawing revision, assembly identity and test results together, and agree how rejected assemblies will be handled. For the illustrative order, use the import duty and VAT guide to calculate landed taxes.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on cine-projector intermittent movements from China?

The supplied tariff data gives 0% duty for projector parts under 9007 92 00 90, with no anti-dumping or countervailing duty listed. Confirm that the supplied movement belongs in this line.

What information does a factory need to quote an intermittent movement?

Send the projector model, film gauge, drawings, rotation direction, mounting and shaft details, and a reference assembly. State which housing, bearings, coupling and sprocket are included.

Does an intermittent movement need a declaration of incorporation?

If the supplied assembly qualifies as partly completed machinery, it should come with assembly instructions and a declaration of incorporation. Establish its status from the exact design and intended use.

How should I test a replacement intermittent movement?

Check dimensions and shaft play, then install it in the intended projector. Run test film and assess picture steadiness, noise, leakage, scratching and perforation damage.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. HSE equipment and machinery frequently asked questions
  3. Exporting or importing objects of cultural interest

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote