Boiler steam separators classified as auxiliary plant under heading 8404, and their parts, carry 0% UK duty from China. Pressure-equipment conformity assessment depends on classification, so confirm the exact vessel and its documentation before sale in Great Britain. Cambridge China Bridge sources boiler steam separators.
Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

UK duty on boiler steam separators
Heading 8404 covers auxiliary plant for boilers of heading 8402 or 8403, condensers for steam or other vapour power units, and parts. This guide concerns separators that remove entrained water from boiler steam. The table shows product variants sharing the auxiliary-plant and parts codes; it does not establish that every steam-line separator belongs here.
Read from the UK Trade Tariff on 1 October 2026, all supplied lines carried 0% duty for goods from China. The supplied facts show no anti-dumping or countervailing duty, steel measure, suspension or attached import control. Import VAT is separate from customs duty.
Give your customs broker the separator drawing, operating description, boiler application and details of any separately supplied parts to confirm the commodity code. For the wider heading, see economisers and boiler auxiliary plant.
| Goods | Commodity code | Duty | Anti-dumping or countervailing duty on China |
|---|---|---|---|
| Baffle-type steam separators used as boiler auxiliary plant | 8404 10 00 00 | 0% | None |
| Replacement baffles for boiler auxiliary steam separators | 8404 90 00 00 | 0% | None |
Specify separation, pressure loss and drainage
Specify steam flow across the operating range, inlet pressure and temperature, expected water carry-over, required outlet steam dryness and acceptable pressure loss. Agree whether the separator uses baffles or centrifugal action, its installation orientation, connection positions, flange details, drain arrangement and access for cleaning. Ask for performance evidence at your operating conditions.
Specify body and internal materials, corrosion allowance, design pressure and temperature, vessel volume, support loads and the inspection plan. Pressure-equipment rules generally cover equipment with maximum allowable pressure above 0.5 bar, subject to exclusions. The conformity assessment procedure depends on classification. Ask the maker to document the classification of the exact separator.
Where conformity marking is required, match the CE or UKCA marking and declaration to the assessment route. Equipment within the sound engineering practice category must have adequate instructions and must not bear pressure-equipment conformity marking unless another applicable law requires it. Importers must ensure that instructions supplied for the Great Britain market are clear, legible and easily understandable English.
Worked duty example
Illustrative example, not a quote: Two engineered boiler steam separator vessels for a boiler-house upgrade, illustrative only under 8404 10 00 00, invoiced at £64,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £69,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £69,000, so it is £13,800. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.
Inspection checklist
Materials and welds: match material certificates to body and internals; check weld records and agreed non-destructive testing against the inspection plan.
Pressure test: witness the agreed test and match the report, vessel identification and design drawing; inspect for leakage and distortion.
Separation and drains: verify baffle or demister installation, flow direction, drain position and access; compare performance evidence with the agreed steam-flow range.
Arrival and documents: check flange faces, supports, capped openings and transit damage; match the nameplate and applicable conformity documents to the delivered vessel. Plan these checks using quality inspection.
Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us
What goes wrong
A separator selected only by connection size can miss the required separation performance or impose excessive pressure loss. Incorrect orientation, obstructed drainage, displaced internals or incompatible drain equipment can leave water in the steam line. Agree the installed arrangement and acceptance criteria before manufacture.
Documents for a different vessel or an unexplained marking are reasons to hold acceptance and investigate. Before using qualifying pressure equipment, a written scheme of examination must be in place and an examination undertaken. Include the new separator in the review of the boiler-house pressure system before commissioning.
Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.
Frequently asked questions
What is the UK import duty on boiler steam separators from China?
The supplied tariff facts show 0% for boiler auxiliary plant under 8404 10 00 00 and parts under 8404 90 00 00, with no listed trade remedies. Confirm that your separator belongs under this heading.
Does a boiler steam separator need CE or UKCA marking?
It depends on its pressure-equipment classification. Check the applicable assessment route and documents. Sound engineering practice equipment must not carry pressure-equipment conformity marking unless another applicable law requires it.
What should I send a Chinese separator factory?
Send steam flow, pressure, temperature, inlet water carry-over, required outlet dryness, permitted pressure loss, installation orientation, connection drawings and the drainage arrangement.
Can I commission the separator after its factory pressure test?