Wood Pellet Machine Quote Check: Georgia
Before paying a deposit for a wood pellet machine bound for Tbilisi, get a detailed proforma, match the seller and payee, and agree a finished-machine test before the balance and dispatch. A bill of lading copy does not prove pellet output. Cambridge China Bridge can check the quote and coordinate China-side checks.

Put the exact machine and package on the proforma
Ask for a revised proforma naming the model, flat-die or ring-die configuration, die specification and roller type. Record motor power, voltage, frequency and phase, including the requirements of auxiliary equipment. Have your installer confirm compatibility with the supply at your Tbilisi site. Use the proforma invoice guide for the remaining invoice fields.
List each included and excluded item: crusher, dryer, cooler, screen, packing equipment, transport packing, spares and replacement dies. Distinguish a standalone mill from a working line. Specify which equipment feeds and handles the pellets. The animal feed pellet mill guide covers a different material application; the wood pellet boiler guide covers equipment that burns pellets.
Tie hourly capacity to your wood material
Do not accept an hourly capacity claim without its assumptions. Put the wood species or material mix, incoming moisture, particle size and preparation method beside the stated output. Ask whether capacity means material fed into the mill or usable pellets after cooling and screening. Record pellet dimensions and the agreed method for judging usable output.
Agree a test using your material or an expressly approved equivalent. Measure moisture and particle size, weigh usable output over an agreed timed run, and record stoppages, rejected material and settings. Identify the finished machine by its rating plate and serial number. A video of another machine is insufficient. The machine throughput guide explains how to define the test.
Change the balance-payment checkpoint
If the offer asks for a deposit and the balance against a bill of lading copy, ask to revise the release conditions before paying. A genuine shipment document provides shipment evidence, not proof of machine quality or pellet output. By the time the copy arrives, the machine may already have left the factory, making correction harder.
Agree the sequence in writing: deposit, production, pre-shipment inspection and a test run on the finished machine, accepted report and correction of faults, then balance payment before the goods leave. For a shipment using original bills of lading, agree that the seller or agreed document holder retains the originals until the balance clears. Ask the forwarder to confirm the document-release arrangement. Retaining originals does not replace inspection. For another machinery payment scenario, see rice mill quote checks in the Philippines.
Match the seller, exporter and bank beneficiary
Obtain the exact Chinese legal name, unified social credit code and readable business licence. Compare the name and code with the record on China’s National Enterprise Credit Information Publicity System when accessible. The official register could not be opened during this research. A seller-provided record screenshot can help comparison, but arrange an independent check before relying on it.
Match the proforma seller, proposed commercial-invoice exporter and bank beneficiary to the licence holder. Keep Chinese legal names alongside English trading names. If a trading company or separate exporter appears, obtain its licence and a written explanation linking the entities and their roles. Resolve discrepancies and request corrected documents before the deposit; repeat the comparison before the balance.
Check safety evidence and the Georgia handoff
Make CE marking and machinery electrical safety explicit checklist items. If CE is claimed, ask for the declaration of conformity identifying the exact machine and configuration. HSE warns against assuming machinery is safe merely because it carries UK or CE marking, and advises identifying and managing electrical supply risks. Ask your installer to review the electrical drawings, isolation and protective arrangements. For acceptance in Georgia, check with the authority or your clearing agent.
Normally, the buyer coordinates destination clearance with a local clearing agent; name that person before paying. Georgia’s Revenue Service brochure describes declaration registration by a person authorised to access its customs system. Confirm the current route for this shipment with Georgia’s Revenue Service or your clearing agent. Send the proforma, draft commercial invoice, packing details and proposed transport documents, and ask what needs correcting before dispatch.
Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us
Get discrepancies resolved before authorising payment
Keep a written list of open points: missing specifications, unproven output, unexplained company names, excluded equipment and unclear payment or document-release conditions. Ask for a revised proforma and referenced attachments that resolve them. Compare transport, installation, commissioning and spare-parts costs in words and scope, rather than comparing the mill price alone.
Send the documents for a quote check. Cambridge China Bridge is a UK company with its own staff in China and can coordinate the China-side checks. Review our company information before appointing us, and see the worked machine quote-check note for an example of recording discrepancies.
Frequently asked questions
What should a wood pellet machine proforma include?
The model, die and roller type, motor power and electrical supply, hourly capacity with wood moisture and size assumptions, and a clear list of included equipment, packing, spares and dies.
Is paying the balance against a bill of lading copy safe?
The copy does not prove machine quality or output. Agree inspection and a finished-machine test before the balance and dispatch, with original shipping documents retained until the balance clears.
What if the Chinese seller and bank beneficiary differ?
Pause payment. Obtain the beneficiary’s licence and a written explanation connecting the seller, exporter and payee. Resolve the mismatch and correct the documents before paying.
Who should check clearance for a machine going to Tbilisi?
Ask Georgia’s Revenue Service or your clearing agent to confirm the current clearance route and shipment documents. Send them the machine specification and draft paperwork before paying the deposit.