Sourcing waste-heat steam boilers from China
Waste-heat steam boilers from China carry 0% UK import duty across the relevant heading 8402 lines, with no listed trade remedies. For Great Britain, agree the pressure-equipment conformity route and arrange the user's written scheme of examination before use. Cambridge China Bridge sources waste-heat steam boilers.
Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Zero duty on waste-heat steam boilers
Heading 8402 covers steam or other vapour generating boilers, superheated water boilers and parts. For waste-heat steam boilers, the relevant distinctions are watertube, firetube and other boiler construction. Waste heat describes the heat source; it does not identify the commodity code by itself.
Read from the UK Trade Tariff on 1 October 2026, all the selected lines carried 0% duty for goods from China. The supplied tariff data lists no anti-dumping or countervailing duties, suspensions or attached import controls. Zero customs duty does not remove pressure-equipment obligations.
Confirm the commodity code using the construction, steam output and scope of supply. Watertube lines divide at 45 tonnes per hour. For the wider heading, see steam boilers from China.
| Goods | Commodity code | Duty | Anti-dumping or countervailing duty on China |
|---|---|---|---|
| Watertube waste-heat steam boilers exceeding 45 tonnes per hour | 8402 11 00 00 | 0% | None |
| Watertube waste-heat steam boilers not exceeding 45 tonnes per hour | 8402 12 00 00 | 0% | None |
| Firetube waste-heat steam boilers | 8402 19 10 00 | 0% | None |
| Other waste-heat vapour generating boilers, including hybrid boilers | 8402 19 90 00 | 0% | None |
Match the boiler to the exhaust stream
Specify exhaust-gas flow, inlet temperature and operating range, gas composition, dust loading and allowable back pressure. Give the required steam output, operating pressure, feedwater condition and expected start-up and shutdown pattern. Ask for a heat balance based on your actual exhaust stream rather than a catalogue steam-output claim.
Agree tube and shell materials, corrosion allowance, cleaning access, gas bypass arrangements and the boundary between the boiler and site pipework. Define who supplies feedwater equipment, safety valves, instruments and controls. Request English operating instructions and drawings showing gas connections, steam connections, supports and lifting points.
The Pressure Equipment (Safety) Regulations 2016 regulate pressure equipment with a maximum allowable pressure greater than 0.5 bar. Agree the category, conformity assessment and applicable CE or UKCA marking with the manufacturer before fabrication, together with the declaration of conformity. The user needs a suitable written scheme of examination and the required examination completed before use; confirm with HSE who should draw up or certify the scheme.
Worked duty example
Illustrative example, not a quote: One firetube waste-heat steam boiler; illustrative order only under 8402 19 10 00, invoiced at £60,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £65,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £65,000, so it is £13,000. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.
Inspection checklist
Identity and documents: match the nameplate, serial number, design pressure and supplied assembly to the declaration, approved drawings and test records.
Pressure boundary: review material traceability, weld inspection records and the witnessed hydrostatic test against the agreed inspection plan.
Gas path and controls: check tube access, bypass operation, gas-connection dimensions, safety valves, water-level protection and the agreed control sequence.
Arrival condition: inspect tube ends, flanges, supports, insulation and transport bracing for damage or distortion. Photograph discrepancies before installation; use the quality inspection guide to plan checks.
Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us
What goes wrong
An output promise based on hotter or cleaner exhaust than your plant supplies can leave the boiler short of steam. An unsuitable gas path can add excessive back pressure, while poor cleaning access makes deposits difficult to remove. Put the exhaust conditions and acceptance method into the purchase specification.
Certificates may cover a different pressure, design or assembly, and leaking tube joints or damaged supports can delay installation. Resolve document mismatches and fabrication defects before shipment. A factory pressure test does not replace the user's written scheme and required examination before use.
Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.
Frequently asked questions
What is the UK import duty on waste-heat steam boilers from China?
The selected heading 8402 lines carry 0% duty for goods from China.
Do Chinese waste-heat steam boilers need CE or UKCA marking?
Agree the pressure-equipment category and conformity route before manufacture. Confirm with the relevant authority whether the steam boiler needs CE or UKCA marking and a declaration of conformity.
What exhaust information does the boiler factory need?
Give gas flow, inlet temperature, operating range, composition, dust loading and allowable back pressure, plus steam demand and feedwater conditions. Ask for a heat balance using those inputs.
Can I use the boiler after its factory pressure test?
The factory test alone is insufficient. Before use, the user needs a suitable written scheme of examination and the required examination completed. Confirm with HSE who should draw up or certify the scheme.