Sector guides

Sourcing tyre-mounted gantry cranes from China

Rubber-tyred container gantry cranes from China fall within heading 8426, where the supplied tariff lines all carry 0% UK duty. Confirm the applicable machinery supply rules, conformity documents, marking and instruction-language requirements with the relevant authority. Cambridge China Bridge sources rubber-tyred container gantry cranes.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-28

Aisles of a large supermarket seen from above, shelves fully stocked

Duty and classification for tyre-mounted gantries

Read from the UK Trade Tariff on 1 October 2026, heading 8426 covers cranes, mobile lifting frames and straddle carriers. Rubber-tyred container gantries should be assessed against 8426 12 00 00, mobile lifting frames on tyres and straddle carriers. The table shows drive-system variants within that same tariff line.

All lines in the supplied heading carry 0% duty for goods from China. The supplied facts record no anti-dumping or countervailing duty, suspensions or attached import controls. This tariff position does not replace machinery safety requirements.

Give your customs broker the general arrangement, lifting function, wheel layout and propulsion details to confirm the commodity code. For the wider heading and a different container-handling layout, see container straddle carriers.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Diesel-electric rubber-tyred container gantry cranes8426 12 00 000%None

Specify the yard, spreader and power system

Specify rated load at the spreader, whether its weight is included, container sizes, stacking clearance, span over container rows and the vehicle lane. Supply the yard layout, pavement condition, gradients and turning space. Agree wheel loads, tyre specification, steering modes, travel speeds and parking arrangements against the actual site.

Choose diesel-electric, cable-fed, battery-electric or hybrid power. Define the supply connection or charging arrangement, cable routing, duty cycle, operator visibility and access for maintenance. Specify spreader twistlock feedback, anti-sway behaviour, travel warnings, wind limits and storm securing. Agree factory demonstrations and the responsibilities for unloading, assembly and commissioning.

For supply in Great Britain, confirm the applicable machinery safety requirements, conformity marking, declaration of conformity and English instructions with the relevant authority. CE marking continues to be recognised alongside UKCA. Where safety depends on installation, confirm the thorough examination requirements before first use and for subsequent examinations with HSE.

Worked duty example

Illustrative example, not a quote: One used compact rubber-tyred container gantry crane for a container repair yard, illustrative under 8426 12 00 00, invoiced at £48,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £53,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £53,000, so it is £10,600. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Structure: compare girders, legs, joints and weld inspection records with the approved drawings. On arrival, check transport damage, corrosion, missing fasteners and alignment before assembly.

Spreader and hoist: witness the agreed lifting tests and check twistlock engagement feedback, ropes, reeving, brakes, overload protection and travel limits. Match the spreader to the containers the yard handles.

Travel and power: demonstrate steering, braking, parking and emergency stops. Inspect tyres and wheel assemblies; compare the delivered power equipment, cable system or charging connection with the site specification.

Documents and identity: match serial numbers to the declaration, English manual, drawings and test records. Check the packing list against delivered assemblies and retain photographs of arrival condition. Plan checks through our quality inspection guide.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A crane can meet the lifting specification yet fail to fit the yard: insufficient stacking clearance, unsuitable wheel loads, obstructed turning space or a cable route across traffic. Spreader feedback can also indicate engagement incorrectly, while wind securing and safe maintenance access may be left out of the purchasing brief.

Documents sometimes cover a different model or omit the supplied spreader and control configuration. Factory testing also leaves site assembly to be checked separately. Freeze the drawings and component schedule before production, record demonstrations, and agree the UK assembly and examination arrangements before dispatch.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.

Frequently asked questions

What is the UK import duty on rubber-tyred container gantry cranes from China?

The supplied tariff facts show 0% duty under 8426 12 00 00, with no recorded anti-dumping or countervailing duty, suspensions or attached import controls.

Can a container gantry crane carry CE marking in Great Britain?

Yes. CE marking remains recognised alongside UKCA under the machinery supply rules. Check the declaration, marking and English instructions for the delivered crane.

Does an imported container gantry need examination before use?

Where safety depends on installation, confirm with HSE whether thorough examination is needed before first use. Arrange the competent examiner and site assembly checks before commissioning.

What should I check before ordering a rubber-tyred container gantry?

Check spreader compatibility, rated load, stacking clearance, span, wheel loads, pavement suitability, steering space, power arrangements, wind securing and maintenance access.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Supply of Machinery (Safety) Regulations: Great Britain guidance
  3. Thorough examinations and inspections of lifting equipment

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote