Sourcing rail-mounted portal cranes from China
Rail-mounted portal jib cranes from China pay 0% UK duty, with no duty variation across heading 8426 in the supplied tariff data. Confirm applicable machinery supply rules with HSE, including whether equipment whose safety depends on installation needs thorough examination before first use. Cambridge China Bridge sources rail-mounted portal cranes.

Zero duty and the portal-jib classification
Read from the UK Trade Tariff on 1 October 2026, heading 8426 covers cranes and related lifting machinery. Rail-mounted portal jib cranes are covered by the portal or pedestal jib description under 8426 30 00 00. The supplied data records 0% duty for goods from China, with no anti-dumping or countervailing duty, suspensions or attached import controls.
The table includes neighbouring classifications for comparison, rather than separate varieties of portal jib crane. A rail-mounted gantry with a travelling trolley has a different description from a portal-mounted slewing jib. Confirm the commodity code using drawings, lifting arrangement and travel system. See mobile harbour cranes for the wider heading.
| Goods | Commodity code | Duty | Anti-dumping or countervailing duty on China |
|---|---|---|---|
| Portal or pedestal jib cranes | 8426 30 00 00 | 0% | None |
| Other gantry, bridge and transporter cranes | 8426 19 00 00 | 0% | None |
| Other self-propelled lifting machinery, not on tyres | 8426 49 00 90 | 0% | None |
| Other lifting machinery, not self-propelled or for road-vehicle mounting | 8426 99 00 00 | 0% | None |
Specify the rail interface and lifting envelope
Specify the load chart across the working radius, lifting height, slewing range, travel distance and operating duty. Give the factory the rail gauge, rail profile, wheel arrangement, available clearances and power supply. Request wheel loads and foundation reactions for review by the site designer. Agree wind conditions, parking arrangements, rail clamps, corrosion protection and access for maintenance.
For Great Britain, confirm with HSE the requirements applicable to the crane under the Supply of Machinery (Safety) Regulations 2008, including essential health and safety requirements, conformity marking, a declaration of conformity and English instructions. CE marking remains recognised indefinitely. Ask for documents covering the delivered crane and agree who handles installation and commissioning.
Worked duty example
Illustrative example, not a quote: A compact rail-mounted portal jib crane for a yard, illustrative order under 8426 30 00 00, invoiced at £48,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £53,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £53,000, so it is £10,600. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.
Inspection checklist
Rails and wheels: compare wheel spacing, flange profile and travel drawings with the approved runway design. On arrival, check wheels, bogies and connection faces for transport damage.
Structure and protection: check portal legs, jib connections, weld inspection records and coating condition against the agreed drawings. Confirm that assembly marks and supplied fasteners match the packing list.
Controls and brakes: witness the agreed factory load tests and functional checks of hoist brakes, travel brakes, limit switches, overload protection and emergency stops. Check rail clamps and parking devices.
Documents and assembly: match the crane identification to the declaration, load chart and English manual. Arrange installation and thorough examination before use where safety depends on installation. Use a product-specific inspection brief.
Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us
What goes wrong
A crane can match the quoted lifting capacity yet fail to fit the site. Wheel geometry may not match the rails, foundation loads may arrive after civil work is complete, or the jib may foul buildings and stored goods. Freeze the rail interface and clearance drawings before fabrication.
Missing limiters, unsuitable electrics and documents for a different crane create acceptance problems. Confirm with HSE whether equipment whose safety depends on installation requires thorough examination and whether factory tests satisfy any part of that process. Agree the UK installation, examination and handover responsibilities before shipping.
Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.
Frequently asked questions
What is the UK import duty on rail-mounted portal cranes from China?
The supplied tariff data records 0% under 8426 30 00 00, with no anti-dumping or countervailing duty, suspensions or attached import controls.
Is a rail-mounted gantry crane the same commodity code?
Do not assume so. Portal jib cranes and gantry cranes have different tariff descriptions. Give your broker drawings showing the lifting arrangement and travel system.
Does a new portal crane need examination after installation?
Confirm with HSE whether thorough examination is required before first use where safety depends on installation, and which subsequent examinations apply under the lifting equipment rules.
What should I send the factory with my enquiry?
Send the load and radius requirements, lifting height, rail gauge and profile, site clearances, operating duty, power supply and environmental conditions. Request wheel loads and foundation reactions.