Suppliers & quality

Can a school or council name a brand in a tender?

Where the Procurement Act technical-specification rules apply, a school or council may name a brand only when necessary to explain its requirements. Proven equivalents must not be disadvantaged. Define the function and evidence needed before seeking Chinese alternatives. Cambridge China Bridge can help gather factory evidence.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-10-17

A worker in a hi-vis vest and hard hat inspecting machinery in a plant

Check the buying route before drafting

Ask the procurement lead to confirm which rules govern this purchase before using the approach below. This guide addresses the Procurement Act technical-specification guidance where it applies, rather than assuming every school purchase follows the same procedure.

Our product specification guide covers factory drawings, materials and acceptance checks. Public tender drafting adds a different question: does the specification describe the need without unnecessarily favouring the equipment already on site?

Specify what the equipment must do

The guidance requires performance or functional requirements unless that approach is inappropriate. Describe the task, operating conditions, compatibility and required performance. For a classroom display, ask what users need to connect, view and control before copying a preferred model's catalogue.

Separate essential requirements from preferences. Give each essential requirement a proposed verification method, such as a demonstration, drawing review or test report. Check what Chinese factories can evidence while preparing the specification; our factory consultation guide covers that preparation.

Use brand references only when necessary

Procurement documents must not name brands, producers or places of origin unless necessary to make the requirements understood. When such references are used, the documents must provide that alternatives demonstrating equivalence will not be disadvantaged. Adding 'or equivalent' does not remove the need to justify the reference.

Record why the reference is necessary and translate the relevant features into checks. Suggested wording to adapt after that justification: 'The named model clarifies the required interface and operating performance. Alternatives demonstrating equivalence will not be disadvantaged. Submit supporting evidence against each stated requirement.' For existing equipment, describe the actual connection or interoperability need.

Define how equivalent standards will be assessed

Where standards are appropriate, the guidance requires international standards or UK standards adopting international equivalents; other UK standards are used only where those do not exist. When referring to UK standards, procurement documents must explain that overseas standards considered equivalent will satisfy the requirement. A supplier's assertion of equivalence does not require automatic acceptance.

Ask for a comparison showing the standard's scope, relevant requirements, test methods and supporting results. Identify differences and ask a competent technical reviewer whether they affect the intended use. Keep standard equivalence separate from product suitability: a report should describe the exact model and configuration offered.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

Build an evidence pack for each alternative

The guidance permits certification or other evidence to establish that required standards are met. It says procurement documents should set out the evidence types and when they are requested. Prepare a response sheet linking each requirement to the offered model, supporting document, any limitation and the proposed acceptance check.

Request complete reports rather than certificate photographs, and check that drawings, samples and reports describe the same configuration. Our laboratory testing guide explains where testing and factory inspection serve different purposes. Cambridge China Bridge's staff in China can help gather factory documents and organise sample checks for the buyer's assessment.

Frequently asked questions

Can a council specify a particular equipment brand?

Where these rules apply, only when necessary to make its requirements understood. The documents must provide that alternatives demonstrating equivalence will not be disadvantaged.

Is adding 'or equivalent' enough?

The brand reference still needs to be necessary. Define the features that matter and explain what evidence will demonstrate equivalence, so suppliers can prepare a meaningful response.

Must a school accept a Chinese standard as equivalent?

No automatic acceptance follows from a supplier's claim. When UK standards are specified, overseas standards that the authority considers truly equivalent must be treated as satisfying them.

What should a Chinese equipment supplier submit?

A requirement-by-requirement response, exact model details, relevant reports, compatibility evidence and declared differences. Follow the tender's stated evidence requirements and timing.

Sources

  1. Cabinet Office: Technical Specifications guidance

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote