Sector guides

Sourcing zinc phosphate from China

Zinc phosphate provisionally falls under other phosphates at 4% UK duty from China, with no listed trade remedy or suspension. Confirm the applicable UK REACH position with HSE or your customs broker and address chemical classification before supply. Confirm composition and intended use before ordering. Cambridge China Bridge sources zinc phosphate.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-11-06

Aisles of a large supermarket seen from above, shelves fully stocked

Zinc phosphate duty and classification

Read from the UK Trade Tariff on 6 November 2026, heading 2835 covers phosphinates, phosphonates, phosphates and polyphosphates. For zinc phosphate, the relevant candidate is other phosphates, 2835 29 90 00: 4% duty from China, with no listed anti-dumping or countervailing duty and no suspension. Only this supplied line is relevant to the focused table.

The tariff attaches an import waste control to this line. Waste shipment controls apply only where the material is waste. For recovered or discarded material from China, ask your customs broker to confirm the applicable requirement before shipment. The line also lists export waste and dangerous-chemical controls; confirm these separately if planning an onward export.

Provide the chemical identity, composition, hydration state and intended use when checking the commodity code. Ask for a separate classification review for modified pigments or formulated preparations. See phosphates and STPP for the wider heading.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 6 November 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Other phosphates, including zinc phosphate; confirm composition2835 29 90 004%None

Specify the zinc phosphate grade

State whether you need zinc phosphate powder for a coating formulation or material for another process. Agree chemical identity, hydration state, zinc and phosphate content, moisture, soluble salts, particle size and test methods. Identify any surface treatment or added ingredients rather than accepting a trade name as the specification.

Approve a sample in your own formulation. Record dispersion, settling, viscosity and coating performance against your acceptance criteria. Request a batch certificate of analysis and safety data sheet. Confirm any applicable UK REACH registration responsibilities with HSE or your customs broker, providing the substance identity and annual volume; agree the position before purchasing.

Chemical classification and labelling laws establish a duty to classify chemicals. Arrange a review of the supplied material's classification and proposed labels before selling it.

Worked duty example

Illustrative example, not a quote: Illustrative order: one tonne of zinc phosphate powder under 2835 29 90 00, invoiced at £3,000 free on board, with £1,720 of freight and insurance to the UK. The customs value is £4,720. Duty at 4% is £188.80. Import VAT at 20% is charged on the customs value plus duty, £4,908.80, so it is £981.76. Import taxes total £1,170.56; a VAT-registered importer can usually reclaim the VAT, so the lasting cost is the £188.80 of duty. The import duty and VAT guide explains each step.

Inspection checklist

Identity: match bag markings, batch references and certificates to the agreed zinc phosphate grade and composition.

Analysis: test representative batch samples for agreed zinc and phosphate content, moisture and soluble impurities using the contracted methods.

Powder: check particle size, hard lumps and dispersion in the buyer's formulation against the approved sample.

Packing: inspect liners, seals and pallets for moisture or leakage; compare delivered weights and batch quantities with shipment records.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A supplier's zinc phosphate trade name can conceal a modified composition or a different hydration state. A chemically acceptable batch may still disperse poorly or settle differently in your formulation. Keep composition and application acceptance criteria in the purchase specification.

Damp bags and hard agglomerates complicate handling and dispersion. Missing batch references make certificates difficult to match to stock. Hold affected material for assessment and agree the disposition before blending it into production.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on zinc phosphate from China?

The supplied other-phosphates line, 2835 29 90 00, carries 4% duty, with no listed trade remedy or suspension. Confirm that your composition belongs in this line.

Does zinc phosphate need UK REACH registration?

Confirm with HSE or your customs broker whether UK REACH registration applies to your imports. Confirm your substance identity, annual volume and supply-chain coverage before ordering.

What should a zinc phosphate specification include?

Chemical identity, hydration state, zinc and phosphate content, moisture, soluble salts, particle size, added ingredients and test methods. Include acceptance in your own formulation.

Can I buy zinc phosphate using only a supplier certificate?

Use the certificate as batch evidence, then check representative samples against your specification and approved formulation trial. Match every certificate to the delivered batch.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. HSE: Laws on chemical classification overview
  3. Environment Agency: Waste export and import

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote