Sector guides

Sourcing stainless steel floor gullies from China

Stainless steel floor gullies classified as iron or steel sanitary ware carry 0% UK duty from China, with no trade remedies in the supplied tariff facts. For Great Britain, importers must not supply construction products they have reason to believe are non-compliant. Cambridge China Bridge sources stainless steel floor gullies.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-21

Aisles of a large supermarket seen from above, shelves fully stocked

Duty and classification

Heading 7324 covers sanitary ware and parts of iron or steel. For stainless steel floor gullies classified as sanitary ware, the relevant supplied line is 7324 90 00 90, other sanitary ware including parts. The table shows product variants within that line, rather than separate tariff classifications.

Read from the UK Trade Tariff on 30 September 2026, all supplied heading 7324 lines carried 0% duty for goods from China. The supplied facts list no anti-dumping or countervailing duty, steel measure, suspension or attached import control.

Confirm the complete assembly and separately supplied parts against their material, function and drawings using finding your commodity code. For other sanitary ware within the wider heading, see commercial wash troughs.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 30 September 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Stainless steel floor gullies with vertical outlets7324 90 00 900%None

Specify the outlet, trap and floor connection

Agree a drawing showing the body depth, outlet direction and connection, grating dimensions, finished-floor position and waterproofing flange. Specify steel grade, sheet thickness, weld finish, removable trap and debris basket. Match the outlet to the actual pipe and coupling, rather than relying on a nominal catalogue description.

Agree drainage and grating load tests for the intended location, including trolley traffic where relevant. Ask the supplier to identify the applicable construction-product standard or assessment route and provide supporting documents for the exact model. Importers must not supply construction products to Great Britain if they have reason to believe the products do not comply with applicable requirements.

Where CE marking has been legitimately affixed, the product can continue to be supplied to the Great Britain market without an additional UK marking. Settle the model-specific documentation with testing and certification support before approving production.

Worked duty example

Illustrative example, not a quote: Illustrative order of 1,500 stainless steel floor gullies under 7324 90 00 90, invoiced at £42,000 free on board, with £3,500 of freight and insurance to the UK. The customs value is £45,500. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £45,500, so it is £9,100. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Materials: verify the ordered steel grade and thickness on samples, including the body, grating and basket; compare the finish with the approved sample.

Welds and drainage: inspect seams for pinholes and rough surfaces, leak-test the body and outlet joint, and check that the agreed drainage test leaves no unintended pooling.

Fit and cleaning: trial-fit the specified pipe coupling, trap, basket and waterproofing connection; check that the grating sits securely and removable parts can be taken out for cleaning.

Arrival condition: check distorted flanges, rocking gratings, scratched surfaces and missing seals against the packing list. Record defects through the quality inspection process.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

An outlet can have the right nominal size but still fail to fit the chosen coupling. A body that is too deep clashes with the floor build-up, while a mismatched flange makes the waterproofing connection difficult. Approve a sample with the actual installation components before accepting the production drawing.

Thin gratings bend under traffic, weld pinholes leak and rough internal seams collect debris. Traps and baskets may arrive missing or be difficult to remove after fitting. Compare delivered assemblies with the approved sample and repeat the agreed leak, fit and load checks.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on stainless steel floor gullies from China?

The supplied tariff facts show 0% for sanitary ware and parts under 7324 90 00 90, with no listed trade remedies. Confirm that the particular gully belongs in this line.

Do stainless steel floor gullies need UKCA marking?

Check the applicable product route. For construction products supplied to Great Britain, legitimately affixed CE marking can be used without adding UK marking.

What should I put in a floor-gully specification?

Include steel grade and thickness, body depth, outlet direction and connection, trap design, grating load, waterproofing flange and access for cleaning.

How do I check floor gullies when they arrive?

Check weld leaks, outlet fit, grating seating, trap removal, flange distortion and missing seals. Compare the delivery with the approved sample and installation drawing.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Construction Products Regulation in Great Britain

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote