Sector guides

Sourcing Ship Deck Cranes from China

Ship deck cranes from China carry 0% UK duty across the relevant lines of heading 8426, with no recorded trade remedies. Maritime guidance says testing and examination should be carried out by a competent person. Agree the vessel-specific design and installation plan. Cambridge China Bridge sources ship deck cranes.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-27

Aisles of a large supermarket seen from above, shelves fully stocked

Zero duty, with classification by crane design

Read from the UK Trade Tariff on 1 October 2026, heading 8426 covers ships' derricks and cranes, alongside other lifting machinery. The table selects designs relevant to deck installations. It gives classification candidates, so a deck location alone should not determine the declaration.

Every commodity line in the supplied snapshot carries 0% duty for goods from China. No anti-dumping or countervailing measure, tariff suspension or attached import control is recorded. This tariff position does not establish that a crane suits the vessel or its lifting operations.

Confirm the commodity code using the crane drawings, support arrangement and operating description. For the wider heading, see mobile harbour cranes. Keep a complete crane distinct from separately supplied hoists, winches and crane parts.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Fixed-support overhead travelling cranes for deck cargo handling8426 11 00 000%None
Deck gantry cranes8426 19 00 000%None
Pedestal jib cranes for ship decks8426 30 00 000%None
Ships' derricks and other deck cranes outside the specific crane categories8426 99 00 000%None

Specify the deck interface and operating envelope

Specify cargo or stores handling, boom arrangement, safe working load at each outreach, lifting height, slew range, stowed dimensions and operating speeds. State whether lifting takes place alongside or at sea. Ask for the operating limits for vessel heel, trim, movement and wind, together with a load chart matching those conditions.

Agree pedestal dimensions, bolt pattern, foundation loads, hydraulic pressure and flow, electrical supply, drainage and corrosion protection. Ask the vessel operator and surveyor to agree the design basis and installation plan before ordering. Maritime guidance says a competent person should carry out all tests and examinations; arrange their involvement before shipping.

Worked duty example

Illustrative example, not a quote: Illustrative order: one compact pedestal jib deck crane under 8426 30 00 00, invoiced at £48,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £53,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £53,000, so it is £10,600. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Structure: compare the boom, pedestal and mounting dimensions with the agreed drawings; review material records and weld inspection reports, and inspect coating damage and water traps.

Functions: witness the agreed load and functional tests; check hoisting, slewing, brakes, emergency stops, limit devices and hydraulic leaks against the approved test plan.

Documents: match the serial number, load chart, test records, hydraulic schematic and operating manual to the actual crane and its delivered configuration.

Arrival: inspect lifting points, exposed cylinder rods, hoses and preservation after unpacking; record damage and reconcile loose fittings and spares with the packing list. Use the inspection guide to plan checks.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A headline lifting capacity can conceal a much lower capacity at the outreach needed to reach the quay. Other problems include a pedestal that misses the deck foundation, inadequate stowage clearance, unsuitable hydraulic connections and coating damage beneath transport supports. Put these interfaces and operating conditions into the purchase specification.

Factory tests can leave installation questions unresolved. Agree who checks the deck foundation, connects the services and coordinates onboard testing and examination. Ask for documents tied to the delivered crane, and use factory verification to assess the maker's fabrication and testing capability.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.

Frequently asked questions

What is the UK import duty on ship deck cranes from China?

The supplied tariff snapshot records 0% duty on all lines of heading 8426, including the selected deck-crane candidates, with no anti-dumping or countervailing measure.

Which commodity code covers a pedestal deck crane?

8426 30 00 00 covers portal or pedestal jib cranes. Confirm that the actual design fits that description; other ship cranes or derricks may fall under 8426 99 00 00.

Who should test a ship deck crane?

Maritime guidance says a competent person should carry out all tests and examinations. Agree the factory and onboard test plans with the vessel operator and surveyor before ordering.

What should I send the Chinese factory for a deck crane quote?

Send the required load chart, outreach, lifting height, deck foundation drawing, stowed envelope, hydraulic or electrical supply and vessel operating conditions. Specify the documents and witnessed tests you expect.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Merchant shipping and fishing vessel lifting equipment guidance

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote