Sector guides

Sourcing tower cranes from China

Tower cranes from China carry 0% UK import duty under 8426 20 00 00, with no trade remedies listed. They must meet machinery supply rules; confirm the thorough-examination requirements for installation-dependent lifting equipment with HSE or a competent examiner before first use. Cambridge China Bridge sources tower cranes.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-10-25

Aisles of a large supermarket seen from above, shelves fully stocked

Tower crane duty and classification

Read from the UK Trade Tariff on 1 October 2026, tower cranes under 8426 20 00 00 carry 0% duty for goods from China. The supplied tariff record lists no anti-dumping or countervailing duty, suspension or attached import control for this line.

Heading 8426 covers cranes and related lifting machinery. The table shows tower crane configurations sharing the same tariff line, rather than separate commodity codes. For the wider heading, see our overhead bridge crane guide.

Confirm the commodity code against the complete crane specification and shipment contents. Separately supplied crane parts fall under heading 8431, as explained in the published crane guide. Check separate consignments rather than assuming the complete crane code applies.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Flat-top tower cranes8426 20 00 000%None

Specify the jib, mast and installation

State the crane configuration, jib length, lifting height and required capacity at each working radius. Obtain the load chart for the actual mast, jib and counterweight arrangement. Specify hoisting speeds, controls, site power supply, foundation interface and any building ties. Ask for working and out-of-service wind instructions for that configuration.

A crane placed on the UK market must meet the machinery supply requirements; confirm the applicable declaration of conformity, marking and English-instruction requirements with HSE. Agree who supplies the installation drawings, erection instructions and maintenance information. Arrange UK installation and a competent examiner before shipping; confirm the thorough-examination requirements for installation-dependent lifting equipment with HSE or the examiner before first use.

Worked duty example

Illustrative example, not a quote: Illustrative order: a compact self-erecting tower crane under 8426 20 00 00, invoiced at £48,000 free on board, with £5,000 of freight and insurance to the UK. The customs value is £53,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £53,000, so it is £10,600. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Structure: check mast and jib identification against the drawings, inspect welds and coating damage, and confirm that pins, bolts and connection components match the agreed specification.

Controls: witness operation of brakes, emergency stops, travel limits and overload protection. Match the load chart and limiter settings to the crane configuration being delivered.

Documents: match the declaration, English manual, installation drawings and component list to the delivered crane. Check that the foundation and counterweight information is included.

Arrival: reconcile mast sections, jib sections, counterweights and connection kits with the packing list. Record transport damage and missing components before arranging erection. See our quality inspection guide.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A headline lifting capacity can conceal inadequate capacity at the required radius. Mixed mast sections, missing connection kits or drawings for a different configuration can delay erection. A load chart that does not match the supplied jib and counterweights prevents a meaningful acceptance check.

Factory testing does not settle whether the installed crane is safe to use. Arrange examination of the installed configuration and agree any testing with the competent examiner. HSE says testing deemed necessary may not be needed at every thorough examination.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.

Frequently asked questions

What is the UK import duty on tower cranes from China?

The supplied tariff record gives 0% under 8426 20 00 00, with no anti-dumping or countervailing duty, suspension or attached import control.

Do different tower crane designs have different codes?

The supplied record has a single tower crane line, 8426 20 00 00. Confirm classification against the complete specification; separately supplied parts need their own classification.

Does a new tower crane need examination after installation?

Where safety depends on installation, confirm the thorough-examination requirements before first use with HSE or a competent examiner. Arrange a competent examiner for the installed crane.

What should I request before ordering a tower crane?

Request the configuration-specific load chart, mast and jib drawings, foundation details, counterweight schedule, wind instructions, English manual and conformity documentation.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. HSE: Buying new machinery
  3. HSE: Thorough examinations and inspections of lifting equipment

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote