Sector guides

Sourcing semiconductor PECVD systems from China

Semiconductor PECVD systems and dedicated parts under heading 8486 carry 0% UK duty from China, with no anti-dumping or countervailing duty recorded. Confirm the applicable machinery safety and other product requirements for supply in Great Britain with the relevant authority or your customs broker. Cambridge China Bridge sources semiconductor PECVD systems.

Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-23

Illustrative image: A semiconductor PECVD vacuum deposition tool in a cleanroom: large stainless process chamber, wafer load-lock, vacuum pipes, gas manifold cabinet and computer control panel.
Illustrative image

Duty and classification for semiconductor PECVD

Heading 8486 covers semiconductor and display manufacturing machinery and its parts. PECVD means plasma-enhanced chemical vapour deposition. Systems used principally to manufacture semiconductor devices or electronic integrated circuits fall within 8486 20 00 00. Dedicated parts and accessories fall within 8486 90 00 00, subject to classification of the actual item. The table shows different machine configurations sharing the same commodity code.

Read from the UK Trade Tariff on 1 October 2026, all supplied lines carry 0% duty for goods from China. The supplied facts record no anti-dumping or countervailing duty, suspensions or attached import controls. That tariff position does not replace machinery safety compliance.

Confirm the commodity code using the process description, intended semiconductor application and shipment contents. Describe separately shipped pumps, gas cabinets and other equipment individually rather than assuming every item shares the deposition system's code. For related equipment within the wider heading, see semiconductor plasma etching machines.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Single-wafer PECVD systems for semiconductor device manufacture8486 20 00 000%None
Dedicated parts and accessories for semiconductor PECVD systems8486 90 00 000%None

Specify the film process and factory interfaces

Specify the substrate material and size, films to be deposited, permitted substrate temperature and required thickness, uniformity, stress and particle performance. Define measurement methods and acceptance criteria using your own substrates and recipes. State whether the system is single-wafer, batch or clustered, and agree how loading, chamber cleaning and recipe changes affect demonstrated throughput.

Agree the process gases, gas delivery components, vacuum pumps, exhaust treatment, cooling water and electrical connections. HSE's chemical vapour deposition guidance advises operating deposition units as a closed system with extraction. Ask the supplier and site engineer to review the interface drawings together before manufacture.

For supply in Great Britain, confirm the applicable conformity assessment, declaration and CE or UKCA marking requirements under the Supply of Machinery (Safety) Regulations 2008 with the relevant authority or your customs broker. The responsible person must compile the technical file and make it available on request. Agree installation, training, software access, recipe ownership and spare parts support before shipment; testing and certification can help organise document checks.

Worked duty example

Illustrative example, not a quote: 3 single-wafer semiconductor PECVD systems for a process-development business; illustrative only under 8486 20 00 00, invoiced at £450,000 free on board, with £15,000 of freight and insurance to the UK. The customs value is £465,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £465,000, so it is £93,000. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Film results: witness deposition on your substrates and review thickness maps, uniformity, film stress and particle measurements against the agreed methods and criteria.

Chamber and handling: check seals, showerhead condition, electrode surfaces, substrate supports, loading alignment and vacuum leak-test records; repeat functional checks after installation.

Gas and safety systems: have competent personnel verify gas-line identification, purge sequences, detectors, interlocks, emergency stops and extraction interfaces using an agreed safe test procedure.

Documents and packing: match the machine identity to its declaration and manuals, check the agreed technical-file arrangements, record included spares and inspect crates and shock indicators on arrival. Use quality inspection to agree the inspection scope.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A demonstration film can look acceptable while measurements across the substrate fail the agreed uniformity or stress criteria. Results may change after chamber cleaning or when the buyer uses a different substrate. Require recorded acceptance runs that reflect your intended process, rather than relying on a photograph or a supplier's standard recipe.

Commissioning stalls when gas connections, exhaust treatment or cooling interfaces do not match the site. Worn seals and contaminated chamber parts can undermine refurbished equipment, while locked software prevents recipe changes. Agree the component condition, access rights, installation responsibilities and site acceptance procedure before dispatch.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.

Frequently asked questions

What is the UK import duty on PECVD systems from China?

The supplied tariff facts show 0% duty for semiconductor manufacturing systems under 8486 20 00 00 and dedicated parts under 8486 90 00 00, with no anti-dumping or countervailing duty recorded.

Do semiconductor PECVD systems need CE or UKCA marking?

For machinery supplied in Great Britain, confirm the applicable conformity assessment, declaration and CE or UKCA marking requirements under the Supply of Machinery (Safety) Regulations 2008 with the relevant authority or your customs broker. Check the documents for the actual system.

What should a PECVD factory acceptance test measure?

Use your substrates to measure film thickness, uniformity, stress and particles. Agree the methods and criteria beforehand, and demonstrate loading, cleaning and recipe operation as well as deposition.

Can I buy a refurbished PECVD system from China?

Assess it against a disclosed component and condition list. Check chamber contamination, seals, pump condition, software access and support, then agree factory and site acceptance tests before ordering.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Supply of Machinery (Safety) Regulations 2008: Great Britain
  3. HSE chemical vapour deposition guidance

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote