Sourcing rotary lobe pumps from China

Rotary lobe pumps from China carry 0% UK duty under the relevant rotary positive displacement line. Complete new machinery sold in Great Britain must carry CE or UKCA marking, a declaration of conformity and English instructions. Specify the liquid and operating conditions before choosing seals and rotors. Cambridge China Bridge sources rotary lobe pumps.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-10

Illustrative image of rotary lobe pumps on a workshop surface.
Illustrative image

Zero duty on the relevant pump and parts lines

Read from the UK Trade Tariff on 30 September 2026, heading 8413 covers pumps for liquids and liquid elevators. For rotary lobe liquid pumps, the relevant candidate is 8413 60 80 90, covering other rotary positive displacement pumps. The table repeats that line for different buying configurations; these are not separate tariff subdivisions.

The pump line and other pump parts line 8413 91 00 90 carry 0% duty on goods from China. The supplied tariff data records no anti-dumping or countervailing duty, suspension or attached import control for either line. Dedicated pump parts need their own classification check.

Confirm the commodity code using the pumping mechanism, liquid application and scope of supply. Do not classify a lobe pump as a gear or vane pump simply because it rotates. For another pump family within this heading, see progressive cavity pumps. For concrete pumps, see our concrete pump sourcing guide.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 30 September 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Rotary lobe pumps for viscous process liquids8413 60 80 900%None
Dedicated rotary lobe pump casings and rotors, subject to classification8413 91 00 900%None

Specify the liquid, rotor clearances and cleaning

Give the factory the liquid composition, viscosity at operating temperature, solids content, required flow, differential pressure and suction conditions. Agree the rotor profile, operating speed, wetted materials, seal arrangement and connection drawings. Request performance evidence using a representative liquid rather than relying solely on a water test.

For cleaning-sensitive applications, agree how the casing drains, how the cover opens and how seals and rotor recesses are cleaned. Specify cleaning chemicals and temperatures, surface finish acceptance and replacement seal materials. Ask for a demonstration of dismantling and reassembly without damaging the sealing faces.

For complete new machinery placed on the Great Britain market, CE or UKCA marking, a declaration of conformity and English instructions are required. Match the documents to the supplied pump assembly, motor and controls. Arrange testing and certification checks before accepting the production configuration.

Worked duty example

Illustrative example, not a quote: Illustrative order of 40 compact rotary lobe pumps under 8413 60 80 90, invoiced at £28,000 free on board, with £4,000 of freight and insurance to the UK. The customs value is £32,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £32,000, so it is £6,400. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Performance: check flow, differential pressure, speed and motor load against the agreed operating conditions; record the test liquid and temperature.

Rotors and seals: inspect rotor clearance, timing, rubbing marks and seal leakage during the agreed run test; confirm replacement parts fit the supplied model.

Cleaning and connections: inspect wetted surfaces, drainage, gasket seating and port dimensions; witness cover removal and reassembly.

Arrival: check transport damage, shaft rotation, baseplate alignment, guards and document identity before installation. Use the same acceptance sheet for quality inspection before dispatch.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A water demonstration can conceal poor performance with a viscous liquid. Unsuitable speed or suction conditions can cause noise and an unstable flow. Incorrect rotor timing or clearances can leave rubbing marks; incompatible seals can swell or leak. Agree a representative test and record the pump configuration.

A clean-looking casing can still retain product around seals and recesses. Misaligned pipework can load the connections, while transit movement can disturb the drive alignment. Check cleaning access and alignment, and retain the approved drawings, test records and spare-part descriptions.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For machinery and equipment, see machinery imports.

Frequently asked questions

What is the UK import duty on rotary lobe pumps from China?

The relevant pump line 8413 60 80 90 carries 0% duty. The supplied tariff data records no anti-dumping or countervailing duty for this line.

Is a CE certificate enough for a rotary lobe pump?

Complete new machinery for Great Britain needs CE or UKCA marking, a declaration of conformity and English instructions. Check that the declaration identifies the supplied assembly.

Can I accept a rotary lobe pump tested only with water?

Ask for evidence at your liquid's viscosity and temperature. A water test alone does not establish the agreed flow, motor load or suction performance with your process liquid.

What spare parts should I request with a lobe pump?

Agree model-specific seals, gaskets and replacement rotors where appropriate. Obtain part drawings and material descriptions, and confirm the replacement procedure before ordering.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Buying new machinery

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote