Sector guides

Sourcing hot-rolled steel bulb flats from China

Hot-rolled steel bulb flats from China have a 50% listed UK duty, with a 0% route where steel quota is available. Classification depends on the complete cross-section, width, composition and processing. Ship-work authorised use does not remove the steel measure. Cambridge China Bridge sources hot-rolled steel bulb flats.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-27

Aisles of a large supermarket seen from above, shelves fully stocked

Bulb-flat codes and the steel quota

Read from the UK Trade Tariff on 2 October 2026, heading 7216 covers angles, shapes and sections of iron or non-alloy steel. The specific bulb-flat lines are 7216 50 91 10 for widths up to 204 mm and 7216 50 91 90 for other bulb flats. The table includes neighbouring profile lines for classification comparison; they are not interchangeable bulb-flat codes.

The supplied tariff snapshot lists 50% for these hot-rolled lines, with no anti-dumping or countervailing duty, suspension or attached import control recorded. Our published sections guide describes the continuing 0% steel-quota route. Ask your broker to confirm quota eligibility and availability before budgeting at 0%. Ship-work authorised use relief does not apply to steel products within the steel measure.

Confirm the commodity code using the section drawing, width, steel chemistry and processing history. See the wider steel beams and sections guide. For imports planned from 1 January 2027, confirm with HMRC or your customs broker whether these sections fall within the UK carbon border adjustment mechanism; ask the mill for emissions data and consult our carbon border adjustment guide.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 2 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Hot-rolled profiles fitting within an 80 mm square7216 50 10 0050%None
Hot-rolled bulb flats up to 204 mm wide7216 50 91 1050%None
Other hot-rolled bulb flats7216 50 91 9050%None
Other hot-rolled profiles, excluding bulb flats, for comparison7216 50 99 0050%None

Specify the bulb profile and its intended use

Send a dimensioned cross-section drawing showing overall width, flat thickness, bulb shape and orientation. Specify the steel grade, delivery condition, length, straightness and twist tolerances, surface finish and inspection certificate. For shipbuilding work, agree the customer's required mill approval and material documentation before ordering.

For structural construction use, agree the declaration of performance and applicable UKCA or CE marking described in our sections guide. CE marking remains available for construction products supplied in Great Britain. Match the documents to the actual product and intended use rather than accepting a generic mill certificate.

Worked duty example

Illustrative example, not a quote: 20 tonnes of hot-rolled bulb flats up to 204 mm wide, illustrative only under 7216 50 91 10, invoiced at £18,000 free on board, with £2,000 of freight and insurance to the UK. The customs value is £20,000. Duty at 50% is £10,000. Import VAT at 20% is charged on the customs value plus duty, £30,000, so it is £6,000. Import taxes total £16,000; a VAT-registered importer can usually reclaim the VAT, so the lasting cost is the £10,000 of duty. The import duty and VAT guide explains each step.

Inspection checklist

Profile: measure overall width, flat thickness, bulb dimensions and length against the approved drawing; check straightness and twist.

Material: match heat numbers on the steel and bundle labels to inspection certificates, chemistry and mechanical test results.

Surface: inspect the bulb transition and edges for laps, seams, cracks, rolled-in scale, deep rust and handling damage.

Arrival: check bundle identity, quantity, moisture damage and transit bending before accepting delivery. Use our quality inspection guide to agree the inspection brief.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A similar-looking profile can have a different bulb shape or insufficient flat thickness, disrupting fit-up and welding. Mixed heats, unreadable markings and certificates that describe a different grade make material acceptance difficult. Agree the drawing and traceability documents before the mill starts production.

Long bundles can arrive bent or twisted after poor lifting and support. Agree lifting points, support and protection with the supplier. Duty budgets also fail when quota is unavailable or buyers assume shipbuilding use creates an exemption. Confirm the customs route before shipment.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on bulb flats from China?

The supplied tariff snapshot lists 50% on the bulb-flat lines. Our published sections guide describes 0% where steel quota is available. Confirm the quota position with your broker.

Which commodity code covers hot-rolled bulb flats?

The specific lines are 7216 50 91 10 for widths up to 204 mm and 7216 50 91 90 for other bulb flats. Check the complete cross-section, composition and processing before declaring.

Does shipbuilding use exempt bulb flats from steel duty?

Ship-work authorised use relief does not apply to products within the steel measure. Ask your broker to confirm whether the steel-quota route is available.

What should I ask the bulb-flat mill to supply?

Ask for a dimensioned section drawing, agreed steel grade and delivery condition, traceable inspection certificates, heat markings and the material documents required by your customer.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Implementation notifications on the UK steel trade measure
  3. Construction Products Regulation in Great Britain

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote