Sourcing hearing aids from China
Hearing aids and their parts from China carry 0% UK import duty, with no anti-dumping or countervailing duty shown. For sale in Great Britain, confirm the applicable medical device conformity assessment, UK Responsible Person and MHRA registration requirements with the MHRA. Cambridge China Bridge sources hearing aids.

Zero duty on hearing aids and their parts
Heading 9021 includes hearing aids alongside orthopaedic appliances and other devices that compensate for a defect or disability. Complete hearing aids fall under 9021 40 00 00, excluding parts and accessories; hearing aid parts and accessories fall under 9021 90 10 00. The table separates buying categories that share these commodity codes.
Read from the UK Trade Tariff on 4 October 2026, both hearing aid lines carried 0% duty for goods from China. The supplied tariff facts show no anti-dumping or countervailing duties, suspensions or attached import controls for these lines. This does not replace medical device requirements for sale.
Confirm the commodity code against the complete product and any separately supplied components. Do not assume that a separately shipped charger belongs under the hearing aid accessories code. See orthopaedic supports and braces for the wider heading.
| Goods | Commodity code | Duty | Anti-dumping or countervailing duty on China |
|---|---|---|---|
| Behind-the-ear hearing aids, excluding parts and accessories | 9021 40 00 00 | 0% | None |
| Parts of hearing aids | 9021 90 10 00 | 0% | None |
Acoustic performance, fitting and device documents
Specify the intended users, hearing aid style, fitting range, maximum output, gain, distortion and feedback control. Agree how the factory will measure each characteristic and supply results for the actual model. Settle ear-tip sizes, replaceable receivers, battery type, charging equipment and the contents of each box.
Ask for access to the fitting software and programming interface before approving samples. Confirm that your chosen fitter can adjust the production model, save settings and obtain replacement components. Compare the fitted sample with the configuration the factory will ship.
For the Great Britain market, confirm with the MHRA the applicable conformity assessment for the device class, whether the Chinese manufacturer needs a UK Responsible Person and what registration is needed before sale. Medical devices must carry UKCA or CE marking according to the legislation used for certification. Request the declaration of conformity and applicable certificates for the exact model through testing and certification.
Worked duty example
Illustrative example, not a quote: Illustrative small-business order of boxed hearing aids under 9021 40 00 00, invoiced at £10,000 free on board, with £900 of freight and insurance to the UK. The customs value is £10,900. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £10,900, so it is £2,180. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.
Inspection checklist
Acoustics: compare sampled production units with the approved acoustic test results, including output, gain, distortion and feedback behaviour. Keep listening checks separate from measured performance checks.
Fitting and components: connect samples to the agreed programming system, save and restore settings, and check receivers, tubing, ear tips and battery doors against the approved parts list.
Power and finish: check charging, battery contacts, controls and indicators. Inspect shells for cracks, sharp edges and blocked sound outlets; check that ear tips remain attached during handling.
Documents and traceability: compare model identifiers, serial or batch markings, conformity marking, packaging and English instructions with the approved documents. Record findings at quality inspection.
What goes wrong
A sample can sound acceptable while production units have inconsistent output, excessive feedback or poor battery contacts. Fitting software may be unavailable to the buyer, replacement receivers may not match, or the shipped model may differ from the model named in the documents. Agree measurable acceptance criteria and verify the production configuration before shipment.
Device paperwork does not settle the retail service arrangements. In the UK, only a registered hearing aid dispenser can perform the profession's controlled acts. If your business will offer hearing assessment or prescription services, check the scope with the regulator before offering them.
Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification.
Frequently asked questions
What is the UK import duty on hearing aids from China?
The supplied tariff facts show 0% for complete hearing aids and their parts and accessories, with no anti-dumping or countervailing duty, suspension or attached import control on these lines.
Does a Chinese hearing aid manufacturer need a UK Responsible Person?
For the Great Britain market, confirm with the MHRA whether the manufacturer outside the UK needs a UK Responsible Person and what device registration is required before the device is placed on that market.
Do I register with the MHRA as the importer?
Inform the manufacturer or UK Responsible Person of your intention to import. Confirm with the MHRA whether importer details need to be submitted, who should submit them and what needs to be arranged before shipment.
What should I test before accepting hearing aids?
Check measured acoustic performance, feedback, programming access, charging or battery contacts, ear-tip retention and document-to-model matching. Test production samples against the approved specification.