Sector guides

Sourcing Ferrotitanium from China

Ferrotitanium from China carries 0% UK import duty, with no anti-dumping or countervailing duty recorded in the supplied tariff snapshot. Importers must address chemical classification, labelling and packaging before supply in Great Britain. Buy against agreed chemistry and particle size. Cambridge China Bridge sources ferrotitanium.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-11-08

Aisles of a large supermarket seen from above, shelves fully stocked

Ferrotitanium duty under heading 7202

Heading 7202 covers ferro-alloys. Its ferrotitanium line, 7202 91 00 00, covers both ferro-titanium and ferro-silico-titanium. The table shows product descriptions sharing that commodity line, rather than separate tariff classifications.

Read from the UK Trade Tariff on 1 October 2026, the supplied record shows 0% duty for goods from China under this line. It records no anti-dumping or countervailing duty, tariff suspension, steel measure or attached import control. These tariff findings do not settle chemical-supply obligations.

Confirm the commodity code using the actual alloy analysis and product description, rather than the supplier's grade name alone. Our ferrovanadium guide provides related coverage within the wider ferro-alloy heading.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Ferrotitanium7202 91 00 000%None

Specify titanium content, impurities and particle size

State the titanium content range and agreed limits for aluminium, silicon, carbon, phosphorus and sulphur. Identify whether the order is ferrotitanium or ferro-silico-titanium. Specify the particle size range, permitted fines, net weight and packaging. Ask for a batch analysis certificate tied to the material being shipped.

Agree how samples will be taken and prepared, who will test them and which laboratory will resolve a disputed result. Retain sealed reference samples from loading and arrival. Use testing and certification support to arrange independent analysis against the purchase specification.

Before importing a substance for the first time, consider whether UK REACH registration is required. Classification is a supplier responsibility, and substances and mixtures must be correctly labelled and packaged before being placed on the Great Britain market. A safety data sheet is required where a hazardous chemical is supplied for use at work. Request information for the actual alloy and physical form.

Worked duty example

Illustrative example, not a quote: 10 tonnes of ferrotitanium lumps, illustrative order under 7202 91 00 00, invoiced at £30,000 free on board, with £2,500 of freight and insurance to the UK. The customs value is £32,500. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £32,500, so it is £6,500. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Chemistry: compare independent titanium and impurity results with the agreed limits and the batch certificate.

Size: screen a representative sample, record fines and oversize material, and compare the results with the contract.

Traceability: match bag or drum identifiers, the packing list and analysis certificate; investigate mixed or missing batch marks.

Condition: inspect for damp packaging, contamination and damaged closures; check net weight and segregate suspect material. Use an agreed inspection plan.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A certificate can describe a sample that does not represent the shipment. Mixed batches, titanium below the agreed range or excess aluminium and silicon can leave the material unsuitable for the buyer's melt specification. Too many fines or oversized lumps can also undermine the agreed charging method.

A generic supplier safety sheet may describe a different composition or physical form. Resolve discrepancies before accepting the shipment for use or resale. Keep suspect batches separate and use the agreed retained samples and dispute laboratory to establish whether the delivery meets the contract.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on ferrotitanium from China?

The supplied tariff record, read on 1 October 2026, shows 0% duty under 7202 91 00 00, with no anti-dumping or countervailing duty recorded.

Does ferro-silico-titanium use the same commodity code?

Yes. The supplied tariff line 7202 91 00 00 covers ferro-titanium and ferro-silico-titanium. Confirm that the actual alloy matches this description.

What should a ferrotitanium purchase specification include?

Include titanium content, impurity limits, particle size, permitted fines, packaging and net weight. Agree representative sampling, independent testing and a laboratory for disputed results.

Does ferrotitanium need a safety data sheet?

A safety data sheet is required if the chemical is hazardous and supplied for use at work. Establish the classification of the actual alloy and request a matching sheet.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. HSE: Registration overview
  3. HSE: How does classification work?
  4. HSE: Duties of a GB-based importer
  5. HSE: Safety Data Sheets

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote