Electromagnetic lifting heads and their other parts from China carry 0% UK duty, with no additional trade remedy listed. New lifting machinery sold in Great Britain needs conformity marking, a declaration of conformity and English instructions. Cambridge China Bridge sources electromagnetic lifting magnets.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-16

Aisles of a large supermarket seen from above, shelves fully stocked

Zero duty on electromagnetic lifting heads

Heading 8505 includes electromagnetic lifting heads as well as permanent magnets, magnetic holding devices, couplings, clutches, brakes and parts. This guide concerns powered lifting magnets. The table separates lifting-head applications sharing the same code; these are not separate tariff subdivisions.

Read from the UK Trade Tariff on 16 October 2026, electromagnetic lifting heads under 8505 90 50 90 and other parts under 8505 90 90 90 carry 0% duty for goods from China. The supplied tariff data lists no anti-dumping or countervailing duty, suspension or attached import control for these lines.

Confirm the commodity code using the drawings, function and supplied assembly, especially when ordering separate parts or a complete handling system. For the wider heading, see neodymium and ferrite magnets.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 16 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Electromagnetic lifting heads for steel plate8505 90 50 900%None
Other parts for electromagnetic lifting heads8505 90 90 900%None

Specify the load and power system

Give the factory the load material, mass, thickness, shape, surface condition and handling orientation. Specify whether the application is plate, bar, pipe or loose scrap. Ask for capacity tables tied to your load conditions rather than accepting a pull-force figure without its test conditions.

Agree the supply voltage, current, duty cycle, cable arrangement, suspension drawing and permitted operating temperature. Ask the supplier to document power requirements, backup arrangements and the response to loss of supply. Include the controller and any backup battery explicitly in the purchase specification.

For new lifting machinery placed on the Great Britain market, HSE states that UKCA or CE marking, a declaration of conformity and instructions in English are required. Match the documents to the actual magnet and controller supplied. Arrange testing and certification around that assembly.

Worked duty example

Illustrative example, not a quote: Illustrative order: 2 electromagnetic lifting heads for a steel workshop under 8505 90 50 90, invoiced at £12,000 free on board, with £600 of freight and insurance to the UK. The customs value is £12,600. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £12,600, so it is £2,520. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Identity: match the model, serial identification, markings, declaration and instructions to the delivered assembly and purchase specification.

Structure: inspect the pole face, housing, suspension points, retaining bolts and cable supports for damage and agreement with the approved drawings.

Electrical system: have a qualified tester compare coil resistance, insulation, connectors, controller functions and backup condition with the agreed acceptance criteria.

Performance: arrange a controlled acceptance test using representative load surfaces and the agreed operating conditions. Record holding and release behaviour, warnings and backup operation. Include these checks in the inspection plan.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A successful demonstration on a clean, thick steel block can conceal poor performance on the buyer's actual plate, pipe or scrap. Treat surface gaps, load flexibility and contact area as acceptance-test variables. A capacity claim without matching test conditions makes comparison between suppliers difficult.

Missing backup equipment, an incompatible controller or damaged cables can leave the delivered system different from the approved sample. Require an assembly list and test records before shipment, then reconcile them on arrival. Arrival inspection does not replace the competent-person thorough examination that HSE requires for magnetic lifting devices.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on electromagnetic lifting magnets from China?

The supplied tariff data gives 0% for electromagnetic lifting heads under 8505 90 50 90 and other parts under 8505 90 90 90, with no anti-dumping or countervailing duty listed.

What documents should a lifting magnet come with?

For new lifting machinery sold in Great Britain, HSE requires UKCA or CE marking, a declaration of conformity and instructions in English. Check that the documents match the supplied assembly.

Can I buy a lifting magnet by rated capacity alone?

Ask for capacity data for your material, thickness, shape and surface condition. Agree a representative acceptance test before ordering.

What should I check about power failure?

Ask what holds the load after loss of supply, which warnings operate and what backup equipment is included. Have the agreed response tested under controlled conditions.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. HSE: Safe lifting by machine
  3. HSE: Magnetic lifting devices

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote