Sector guides

Sourcing coordinate measuring machines from China

Coordinate measuring machines from China carry 0% UK duty under the geometrical-measurement line, with no listed trade remedy. Confirm the applicable machinery safety and conformity evidence requirements for powered machines with the relevant authority. Agree accuracy tests before shipping and repeat them after installation. Cambridge China Bridge sources coordinate measuring machines.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-16

Aisles of a large supermarket seen from above, shelves fully stocked

Duty and classification for coordinate measuring machines

Heading 9031 covers measuring and checking equipment not specified elsewhere. Coordinate measuring machines measuring geometrical quantities fall within 9031 80 20 00. Bridge and gantry variants share this line; the table also includes an optical-instrument line and parts for buyers comparing separately supplied equipment.

Read from the UK Trade Tariff on 16 October 2026, the selected lines carried 0% duty for goods from China, with no listed anti-dumping or countervailing duty or suspension. The geometrical-measurement and optical lines have no listed import control. The parts line has a fluorinated greenhouse gas import control attached; confirm its requirements for the actual Chinese shipment with your customs broker.

Confirm the commodity code from the measurement method, machine function and separately supplied components. An optical sensor does not by itself settle the classification of a complete machine. See the wider measuring and inspection guide for other equipment in this heading. For leak testing equipment, see our pressure decay leak tester sourcing guide.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 16 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Bridge-type coordinate measuring machines9031 80 20 000%None
Other optical measuring instruments, subject to classification9031 49 90 000%None
Measuring-machine parts and accessories9031 90 00 000%None

Specify the measuring volume, probes and room

Specify usable measuring travel, maximum workpiece size and weight, probing system, stylus combinations and access to difficult features. Agree length measurement error and probing error against the relevant ISO 10360 tests, rather than accepting an accuracy figure without its test conditions.

Ask for the room temperature conditions, air supply specification and installation requirements behind the quoted accuracy. List the controller, computer, probe heads, fixtures, software licences and report formats in the order. Test software exports using your own parts and drawings.

For powered machines, confirm with the relevant authority the applicable machinery, electrical safety and electromagnetic compatibility evidence requirements and whether UKCA or CE marking is appropriate. Machinery must be safe before it is placed on the Great Britain market or put into service. Keep conformity documents separate from calibration results: they answer different questions.

Worked duty example

Illustrative example, not a quote: Illustrative order of four bridge-type coordinate measuring machines under 9031 80 20 00, invoiced at £120,000 free on board, with £6,000 of freight and insurance to the UK. The customs value is £126,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £126,000, so it is £25,200. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Accuracy: witness length measurement and repeatability tests against ISO 10360-2 and probing tests against ISO 10360-5, using calibrated reference artefacts. Record room conditions and repeat acceptance checks after installation.

Probes and software: reconcile supplied heads, styli and fixtures with the order; run your inspection programme and check report exports, licence activation and backup arrangements.

Packing and arrival: check shipping locks, shock and tilt indicators, granite, air bearings and probe mounts. Record damage before unpacking and follow the maker's installation instructions.

Documents: match the machine identity to its declaration, safety evidence, calibration certificate and software records. Use the inspection guide to organise factory and site acceptance.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A machine can meet its accuracy claim at the factory and fail after transport or installation. Unlocked axes, jolted air bearings and a room outside the agreed temperature conditions can undermine repeatability. Agree the packing method and site acceptance test before ordering.

Missing probe options, licences tied to a computer and reports that cannot enter your quality system can leave a usable machine idle. Include the complete measurement workflow in acceptance, with probe spares and responsibility for recalibration settled in writing.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on coordinate measuring machines from China?

The geometrical-measurement line 9031 80 20 00 carried 0% duty in the supplied tariff extract, with no listed anti-dumping or countervailing duty.

What accuracy evidence should I request?

Request agreed ISO 10360 test results, a calibration certificate traceable to national standards and recorded test conditions. Repeat acceptance tests after installation.

Do powered coordinate measuring machines need UKCA or CE marking?

Check documents for the exact machine supplied.

What should be included with the machine?

List probe heads, styli, fixtures, controller, computer, software licences and report formats. Agree installation, calibration and spare-probe support before ordering.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Supply of Machinery safety guidance for Great Britain

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote