Sector guides

Sourcing construction safety nets from China

Construction safety nets within heading 5608 pay a flat 8% UK duty from China, with no listed trade remedy. For nets intended to catch people, confirm applicable testing and labelling requirements, the relevance of BS EN 1263-1, and installation inspection and handover arrangements with HSE. Cambridge China Bridge sources construction safety nets.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-11-05

Aisles of a large supermarket seen from above, shelves fully stocked

A flat 8% duty

Read from the UK Trade Tariff on 5 November 2026, heading 5608 covers knotted netting of twine, cordage or rope and made-up textile nets. This guide focuses on construction nets intended to catch falling people. See the wider nets and netting guide for other uses.

Every listed commodity line carries 8% duty for goods from China. The supplied tariff data lists no anti-dumping or countervailing duty, suspension or attached import control. Nylon construction nets and nets made from other man-made fibres have separate lines.

Confirm the fibre, construction and whether the goods are made-up nets before choosing the commodity code. The table gives possible material-based lines, rather than interchangeable classifications. Use the duty and VAT guide when budgeting the shipment.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 5 November 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Made-up nylon safety nets of twine, cordage or rope5608 19 11 008%None
Other made-up nylon or polyamide safety nets5608 19 19 008%None
Made-up safety nets of other man-made textile materials5608 19 30 008%None
Other textile safety nets, where the material fits this line5608 90 00 908%None

Specify a net for catching people

State the intended personnel fall-arrest use, fibre, yarn construction, mesh size, knot type, finished dimensions and border rope construction. Agree how dimensions will be measured and identify the supplied attachment ropes. Specify outdoor weathering performance and storage instructions.

Confirm with HSE whether BS EN 1263-1 applies to your safety nets and which mesh, energy absorption, testing and marking provisions are relevant. Ask for reports identifying the actual net design and material, together with the applicable labels and test evidence. Arrange testing and certification checks before approving production.

Confirm with HSE the applicable arrangements for a competent person to inspect the safety-net system after installation and for a handover certificate documenting its safety. Plan this site acceptance separately from the factory inspection.

Worked duty example

Illustrative example, not a quote: Illustrative order of 8 made-up polyester construction safety nets under 5608 19 30 00, invoiced at £1,600 free on board, with £648 of freight and insurance to the UK. The customs value is £2,248. Duty at 8% is £179.84. Import VAT at 20% is charged on the customs value plus duty, £2,427.84, so it is £485.57. Import taxes total £665.41; a VAT-registered importer can usually reclaim the VAT, so the lasting cost is the £179.84 of duty. The import duty and VAT guide explains each step.

Inspection checklist

Mesh and dimensions: measure sampled nets against the agreed specification, including mesh openings and finished shape.

Ropes and joints: check border rope attachment, knot tightness, joins and supplied attachment ropes for substitutions or damage.

Evidence and labels: match net identification, material and construction to the reports; check the safety-net labels and test evidence.

Arrival condition: inspect packaging and nets for cuts, abrasion, contamination and brittle yarn. Keep suspect stock separate while the supplier investigates.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A supplier may offer debris-catching mesh when the order calls for a net to catch people. Describe the intended use explicitly and assess the sample and reports together. A report for a different yarn, mesh or border construction does not establish the performance of the supplied design.

Thin yarn, slipping knots, weak border attachments and omitted weathering treatment can undermine the order. Missing labels also make matching nets to their evidence difficult. Use a quality inspection brief that checks the agreed construction and paperwork together.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on construction safety nets from China?

The supplied tariff data gives 8% on every line of heading 5608, with no listed anti-dumping or countervailing duty, suspension or attached import control.

Which standard covers construction safety nets?

Confirm with HSE whether BS EN 1263-1 applies and which safety-net requirements, testing and marking provisions are relevant. Ask for labels and test evidence matching the net design and material supplied.

Can I buy debris netting to catch falling workers?

Specify personnel fall-arrest use explicitly. Do not approve debris netting for that order without evidence establishing that the supplied design meets the safety-net specification.

Does a factory inspection replace inspection after installation?

Confirm with HSE whether a competent-person inspection of the installed safety-net system and a handover certificate are required before use.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. HSE: Safety nets and soft landing systems

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote