Sector guides

Sourcing cine-camera pin assemblies from China

Cine-camera registration pin assemblies from China carry 0% UK duty when classified as camera parts under 9007 91 00 00; the supplied heading has no rate variation. Confirm the classification and match pin geometry and engagement timing to the camera. Cambridge China Bridge sources cine-camera registration pin assemblies.

Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-11-16

Illustrative image: A precise machined cine-camera registration pin assembly, with two polished film locating pins on a small metal carrier plate beside a short strip of perforated 35 mm film.
Illustrative image

Duty and classification for registration pin assemblies

Heading 9007 covers cinematographic cameras, projectors and their parts and accessories. For a registration pin assembly supplied separately for a cine camera, check the camera-parts line 9007 91 00 00 against its construction and intended use. The table includes neighbouring heading lines for classification context; these are not alternative descriptions of the same assembly. See the wider cine-camera film gates guide.

Read from the UK Trade Tariff on 11 October 2026, all supplied lines carried 0% duty for goods from China. The supplied data lists no anti-dumping or countervailing duty and no suspensions. This guide concerns mechanical registration pin assemblies supplied as camera parts.

The tariff data attaches a DCMS Export Licence flag. Official guidance says there are no cultural-goods import licensing requirements for Great Britain. Ask your customs broker to confirm how the flag applies to the shipment. The commodity code must appear on the import declaration. Confirm the commodity code using drawings, photographs and the camera application.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 11 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Cine-camera parts and accessories, including suitable registration pin assemblies9007 91 00 000%None
Complete cinematographic cameras9007 10 00 000%None
Other cinematographic projector parts and accessories9007 92 00 900%None
Other cinematographic projectors9007 20 00 900%None

Specify pin geometry and camera engagement

Provide the camera model, movement version, film gauge and perforation specification. Agree a drawing showing locating datums, pin profile, tip shape, working length, mounting interface and fit with the mating bushes. Specify material, heat treatment, surface finish and the components included in the assembly.

Agree how the supplier will demonstrate engagement and withdrawal relative to film movement. Approve a sample in the intended camera or a representative fixture before releasing production. For UK business resale, customers have implied rights unless the contract lawfully varies them on terms a court would consider reasonable. Record compatibility claims and acceptance criteria clearly.

Worked duty example

Illustrative example, not a quote: 20 cine-camera registration pin assemblies; illustrative order under 9007 91 00 00, invoiced at £10,000 free on board, with £900 of freight and insurance to the UK. The customs value is £10,900. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £10,900, so it is £2,180. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Geometry: compare pin profiles, working lengths, mounting features and datum relationships with the approved drawing and sample.

Fit: check alignment, free movement, retention and play with the intended carrier, bushes and camera movement.

Film handling: use expendable test film to check engagement, withdrawal and image steadiness; inspect perforations for marking, tearing or distortion.

Arrival condition: check for bent tips, burrs, corrosion and loose components; confirm protective packing and assembly identification against the order.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A pin can fit the mounting hole yet engage the film incorrectly. Wrong tip geometry, excess play or mistimed withdrawal can cause weave, damaged perforations or a jam. A hand-operated fit check alone may miss faults that appear during running.

Keep the approved sample and drawing revision available for inspection. Agree how rejected assemblies will be identified and replaced, and protect pin tips individually during transport. Use a quality inspection brief that includes the mating parts and film test.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on cine-camera registration pin assemblies from China?

The supplied tariff data gives 0% for camera parts under 9007 91 00 00, with no anti-dumping or countervailing duty listed. Confirm that the assembly belongs in this line.

What should I send the Chinese factory?

Send the camera model, movement version, approved drawing, film and perforation specification, mating-part details and an agreed inspection method.

How should registration pin assemblies be tested?

Check dimensions and fit, then run expendable test film in the intended camera or a representative fixture. Examine image steadiness and perforation damage.

Does the cultural-goods flag mean I need an import licence?

Official guidance says cultural goods need no import licence into Great Britain. The supplied tariff flag names an export licence; ask your customs broker to confirm its application.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Exporting or importing objects of cultural interest
  3. Import goods into the UK: step by step
  4. Implied and statutory rights

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote