Suppliers & quality

Mould Steel and Shot Life: How Long an Injection Mould Lasts

A steel name alone cannot establish an injection mould's lifespan. Material selection, tool design, heat treatment, resin, processing and maintenance affect performance. Specify an agreed cycle-life obligation, measurable part-quality requirements and the conditions under which the obligation applies.

Written by Bono Xu, Founder, Cambridge China Bridge · 8 min read · Updated 2026-10-18

A worker in a hi-vis vest and hard hat inspecting machinery in a plant

How long does an injection mould last?

Judge useful life by the mould's ability to produce parts that meet your agreed dimensions, appearance and function. Specify the required output and quality rather than relying on calendar age or a steel name.

For the life obligation, define whether a shot means a completed moulding cycle. Record the number of operating cavities and count acceptable parts separately. Ask whether trial runs, start-up cycles and production with blocked cavities count towards the supplier's stated life.

When buying from China, ask what output this particular tool must deliver, using which resin, and under what circumstances repairs become chargeable.

SPI mould classes 101–105: a specification framework

The Plastics Industry Association publishes Customs and Practices of the Moldmaking Industry. Its public catalogue describes classifications and approximate lifespans intended to reduce confusion when quoting or ordering moulds.

The catalogue does not display the detailed class requirements. The table therefore lists verification questions rather than verified class definitions. Obtain the agreed publication edition before specifying a class; no class-specific cycle limits, production categories or hardness minima are asserted here.

Request evidence of compliance with the agreed class requirements and write the supplier's life obligation separately into the purchase order.

SPI class labels: questions to resolve before ordering
ClassProduction intentionWhat to clarify before ordering
101Confirm against the agreed publication edition.Confirm the complete construction specification, wear provisions and maintenance assumptions.
102Confirm against the agreed publication edition.Identify the applicable construction requirements and any differences from the proposed class 101 specification.
103Confirm against the agreed publication edition.Match the proposed material and construction to the actual resin and required output.
104Confirm against the agreed publication edition.Define the required output and check whether the proposed material and construction suit the application.
105Confirm against the agreed publication edition.Define the acceptance task and the supplier's agreed production obligation.

P20, 718, H13 and S136: what the steel name tells you

ASSAB's material-selection guidance discusses machinability, polishability, toughness, wear resistance and corrosion resistance. Use the proposed product's technical literature to assess suitability for the application.

Specify the cavity and core material separately from the mould base, slides and replaceable inserts. Request exact product designations for the critical components.

The cited manufacturer literature does not provide a universal finished-mould shot-life range for each quotation name. Obtain a tool-specific life obligation rather than assigning a lifespan from the name alone.

Steel names to discuss with the toolmaker
Name on the quotationQualitative guidanceEvidence to request
P20Uddeholm lists AISI P20 in the standard specification for Impax Supreme, a prehardened mould steel with good machinability and polishing properties.Named steel producer, exact product designation, material certificate and delivered condition.
718Uddeholm states that Impax Supreme is sold as AS 718 Supreme in East and Southeast Asian countries served by ASSAB. Check the complete product name rather than assuming every '718' quotation identifies that product.The producer's matching datasheet and traceability to the material used in the tool.
H13Uddeholm lists AISI H13 for Orvar Supreme and describes toughness, through-hardening properties and resistance to thermal shock and thermal fatigue. Specify the actual product and heat treatment.Exact grade, heat-treatment record and agreed final hardness verification.
S136Clarify the actual product behind this quotation name. ASSAB describes Stavax ESR as a through-hardening, corrosion-resistant mould steel with very good polishability; that does not authenticate an 'S136' quotation.Written identification of the actual product and its producer's datasheet. Require evidence for any claimed equivalence.

Aluminium or steel?

Uddeholm describes Alumec 89 as suitable for prototype tools and short or medium production runs not subjected to high pressures or abrasive plastics. Its brochure identifies machining and thermal-conductivity advantages. These statements concern that product and do not establish the life of every aluminium mould.

Compare the proposed aluminium alloy and steel product against the required output, wear resistance, toughness, corrosion resistance and surface finish. Include expected design changes in the purchasing decision.

Ask the toolmaker to compare both routes against the same resin, geometry, finish and expected output. Identify any proposed steel inserts and include their replacement costs in the comparison.

Why the same steel can give different mould life

Disclose the resin, fillers and additives before material selection. ASSAB's guidance distinguishes wear resistance, corrosion resistance and toughness, and explains that increasing hardness generally improves wear resistance while decreasing hardness improves toughness.

Review gates, thin cores, sliding surfaces, cooling and ejection with the toolmaker. Request design and trial evidence separately from material certificates, and agree how performance will be assessed during production.

Define failure to meet the life obligation using measurable criteria, such as unacceptable flash, dimensional drift or surface deterioration. Distinguish routine consumables and replaceable inserts from major cavity repairs or complete tool replacement.

Use the separate guide to factory tooling maintenance and retirement when agreeing maintenance records, storage and retirement arrangements.

What to specify in the purchase order

Turn the supplier's life claim into an explicit obligation with a defined scope. The following items are purchasing recommendations, not statements that a standard automatically supplies these contract terms.

Address commercial control alongside production requirements. See injection mould tooling cost and ownership for payment, ownership and transfer considerations, and sourcing injection moulds and tooling from China for the wider buying process.

Purchase-order checklist for steel and shot life
SpecifyWhat the written agreement should establish
Product and resinDrawing revision, exact resin and additives, intended use, finish and acceptance criteria.
Tool constructionCavity arrangement, mould base, cores, slides, inserts and compatibility with the intended production machine.
Class and materialsAgreed classification publication and edition, exact material for each critical component, named producer and substitution approval.
Material evidenceCertificates linked to the actual components, heat-treatment records where applicable, and an agreed method of checking final hardness.
Life obligationAgreed shot count, counting method, starting point, treatment of trials and rejects, and the part-quality criteria that must remain achievable.
Operating conditionsResin, process conditions, maintenance responsibilities, records and how a proposed production change affects the obligation.
Acceptance and remediesTrial protocol, reports, approval authority, included repairs, exclusions, response arrangements and responsibility for repair transport.
Handover and controlTool identification, drawings, material records, maintenance history, spare parts and agreed arrangements for access and transfer.

If you sell in the US or EU

US food-contact products — FDA guidance explains that a food-contact material's regulatory status depends on its constituent substances and their applicable authorisations, specifications and conditions of use. Define the intended food-contact use and obtain supporting material evidence; selecting a mould steel alone does not establish finished-article compliance.

US customs valuation — the US customs regulations require the value of qualifying assists to be added to transaction value to the extent not already included. Buyer-supplied tools and moulds can qualify when provided directly or indirectly, free or at reduced cost, for producing goods for export to the US. Ask the customs representative to check valuation and apportionment using the tooling agreement, invoices and production records.

US additional tariffs — USTR's Section 301 search uses the product's tariff subheading to identify relevant Section 301 actions and additional duty. Check an imported mould separately from the moulded goods. Ask the customs representative to check the complete applicable tariff treatment; the Section 301 search is not a calculation of every import charge.

EU product requirements — European Commission guidance states that CE marking is required only for products covered by the relevant rules and must not be affixed to other products. Identify the finished product's applicable requirements before approving the tool; a mould class or steel certificate alone does not establish product conformity.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

Great Britain example: tooling costs and import VAT

Suppose a buyer pays for a mould that remains in China and imports the parts into Great Britain using Method 1 transaction-value valuation. HMRC requires relevant tooling payments, or the appropriate value of tooling supplied directly or indirectly free or at reduced cost, to be included where not already included in the goods price. Apportionment needs to be considered; a separate tooling invoice does not by itself exclude the cost.

HMRC's import VAT guidance adds applicable import charges, excluding import VAT itself, and relevant incidental expenses to customs value. Provide the customs representative with the tooling agreement and payment records so the valuation can be checked. This example assumes no duty rate, VAT rate or allocation method.

Compare the specification behind the quotation

Before choosing a supplier, compare the proposed material, supporting evidence, construction, life obligation and repair exclusions on the same basis. Ask suppliers to explain differences before comparing prices.

Prepare the drawing, resin specification, intended market, expected output and existing offers for a quotation review.

Sources

The industry publisher's public catalogue supports the existence and stated purpose of its classification publication, not the detailed class requirements. Manufacturer literature supports the product-property descriptions. Regulatory and customs statements draw on the official FDA, USTR, European Commission, HMRC and US customs regulation sources listed below.

The linked CBP publication could not be retrieved during this review; the US assists statement was checked against the official eCFR provisions instead. Manufacturer examples are not supplier endorsements or mould-life guarantees.

Frequently asked questions

How many shots will my injection mould actually last?

A steel name alone cannot answer that. Ask for a written life obligation tied to your resin, tool construction, operating conditions, maintenance and measurable part-quality requirements.

Does an SPI class guarantee the stated life?

Specify the agreed publication edition and applicable requirements, request evidence of compliance, and write the supplier's life obligation separately into the contract.

Is 718 automatically better than P20?

Compare exact producer designations and datasheets. Require evidence of the steel's identity, delivered condition and suitability for your part rather than deciding from a short quotation name.

Should I pay more for H13 or S136?

Ask which identified requirement justifies the change, such as thermal stress, corrosion resistance or surface finish. Require evidence for the actual product and heat treatment.

Can I use an aluminium mould for saleable production parts?

Discuss the specific alloy against your resin, geometry, pressures, acceptance requirements and intended output. Uddeholm's Alumec 89 guidance includes restrictions concerning high pressures and abrasive plastics. Agree a tool-specific production obligation.

Does a shot-life promise mean the same number of good parts?

Agree cycle counting and acceptable-part counting separately. Specify the operating cavity count, treatment of blocked cavities and rejects, and the quality requirements that must remain achievable.

What should I request to check the mould steel?

Request the exact producer and product designation, certificates traceable to critical components, applicable heat-treatment records and agreed hardness checks. Require material identification separately from hardness results.

Who pays if the mould needs repairing early?

The agreement should distinguish routine maintenance, consumables, premature failure and major repairs. Define exclusions, evidence requirements, repair responsibility and transport costs before ordering.

Sources

  1. Plastics Industry Association: Customs and Practices of the Moldmaking Industry
  2. Uddeholm: Impax Supreme for plastic moulding, including P20 and AS 718 Supreme identification
  3. Uddeholm: Orvar Supreme for plastic moulding, AISI H13
  4. ASSAB: Stavax ESR properties and applications
  5. ASSAB: Tool Steel for Plastic Moulding, material selection and hardness trade-offs
  6. Uddeholm: Alumec 89 technical brochure
  7. FDA: Determining the Regulatory Status of Components of a Food Contact Material
  8. CBP: Customs valuation publication; not retrieved during this review
  9. USTR: How to Navigate the Section 301 Tariff Process
  10. European Commission: CE marking and its scope
  11. HMRC: Valuing imported goods using Method 1, including tooling and assists
  12. HMRC: How to value goods for import VAT
  13. Official eCFR: 19 CFR 152.102, including the definition of an assist
  14. Official eCFR: 19 CFR 152.103, transaction value and valuation and apportionment of assists

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote