CNC Machining Materials: Aluminium/Steel/Stainless/Plastics

Choose CNC materials by service conditions, required properties, machining requirements and total part cost. When buying from China, specify the grade, governing standard, product form and material condition or polymer formulation. Review batch documents and require written approval before substitutions.

Written by Bono Xu, Founder, Cambridge China Bridge · 8 min read · Updated 2026-10-18

A worker in a hi-vis vest and hard hat inspecting machinery in a plant

Choose the material for the finished part

Start with what the part must do: carry a load, resist corrosion, slide against another surface, insulate electrically or retain its shape in service. Give the supplier the operating environment, assembly requirements and any regulated use before requesting material alternatives.

Specify more than a grade name. Include the product form, material condition, required properties, polymer formulation where applicable and surface treatment. Compare the finished-part quotation, including machining, finishing and inspection.

Use the same specification process for replacement components, prototypes and repeat orders. Where failure could cause injury or substantial damage, have the responsible designer approve the material.

Common CNC materials: a practical comparison

Use this table to prepare questions for your designer and supplier. It does not establish suitability for a particular application or rank current material prices. Compare alternatives using the same drawing, quantity, finish and inspection requirements.

Common material choices and questions to resolve before ordering
MaterialWhen to consider itMachining and cost directionWhat to specify or check
6061 aluminiumMachined components where the specified product and temper meet the design.Check machinability for the specified temper and obtain a finished-part quotation.Governing standard, temper, stock form and finish requirements.
7075 aluminiumParts where the designer requires its particular strength properties.Machinable, but obtain a separate stock quotation rather than assuming the same cost as 6061.Exact temper, required properties and suitability for the service environment.
Mild steelGeneral mechanical parts where the selected grade meets the design.Request separate prices for stock, machining and any protective finishing.An actual grade and delivery condition; 'mild steel' is not an adequate purchase specification.
Alloy steelParts for which the designer specifies an alloy steel and required mechanical properties.Ask the supplier to explain the machining and heat-treatment sequence and price each operation.Exact grade, delivery condition, final hardness and responsibility for heat treatment.
304 stainless steelApplications requiring stainless steel, subject to an assessment of the actual environment.Ask for a machining quotation for the specified product and condition.Product standard, condition, surface requirements and evidence supporting corrosion suitability.
316 stainless steelApplications where the designer specifies it for the exposure conditions.Quote separately from 304; do not assume identical stock cost or cutting time.Exact grade and condition; the label alone does not establish suitability for every corrosive environment.
BrassTurned components where the selected alloy meets the design.Free-cutting brass offers good machinability; do not extend that assessment to every brass alloy.Exact alloy, composition restrictions and requirements for the intended contact or service use.
POM, also called acetalMachined plastic components where the specified formulation meets the design.Request a quotation for the actual stock grade and verify finished dimensions on a sample.Manufacturer, exact formulation, stock batch and dimensional acceptance conditions.
ABSMachined plastic components where the specified formulation meets the design.Ask how clamping, cutting heat and thin features will be controlled to meet dimensions and finish.Exact formulation, colour, stock form and the properties needed in the final application.
PEEKApplications where the specified formulation and documented properties are necessary.Obtain a stock quotation and agree allowances for stock waste and rejected parts.Manufacturer, formulation, fillers, stock batch and application-specific evidence.

Chinese versus ASTM or EN grades: approve evidence, not a conversion chart

Do not approve a substitution between Chinese GB or GB/T, ASTM and EN specifications solely because a supplier calls the materials equivalent. This guide asserts no cross-standard grade equivalence. Ask for the proposed standard and material documents before approving a change.

The official Chinese standards record identifies GB/T 3190-2020 as a chemical-composition standard for wrought aluminium and aluminium alloys. ISO 209:2024 specifies chemical-composition limits for wrought aluminium products and ingots intended for working. These scopes do not demonstrate that a supplied batch meets your product specification.

Ask the supplier to identify the exact grade, standard edition, applicable amendments, product form and delivery condition on both sides of the proposed substitution. Have the responsible designer compare the applicable requirements with the certificate, including composition and relevant mechanical properties.

Check temper, hardness, dimensions and service suitability separately from composition. If the evidence is incomplete, retain the original specification or agree appropriate testing before accepting a change.

For plastics, specify more than POM, ABS or PEEK. Request the actual manufacturer and formulation, including fillers and additives where relevant. Use the applicable material datasheet for selection and batch documentation to identify the supplied stock.

Compare finished-part cost, not material price alone

Request separate quotation items for stock, machining, heat treatment, surface treatment and inspection. Ask suppliers to identify assumptions about stock availability and substitutions.

Keep the drawing and acceptance requirements fixed when comparing materials. Ask each supplier to explain its proposed machining route, workholding, heat treatment and distortion controls. Assess a proposed alternative against the specification as well as the price.

For a detailed quotation breakdown, read CNC machining cost drivers in China. For plate used in fixtures or tooling, see sourcing aluminium tooling plate from China.

Material certificates and traceability: agree the chain before cutting

Specify the documents required in the purchase order. ISO 10474:2013 defines types of inspection documents supplied for steel products according to order requirements. Identify the document type, tests and verification you expect rather than requesting only a 'material certificate'.

For metals, request the original mill certificate showing the manufacturer, material designation, applicable standard, heat or batch identity, and the test results required by your order. Where material comes through a stockholder, request records linking the supplied stock to that certificate.

For plastics, request the stock manufacturer's identity, formulation, production batch and the agreed certificate of conformity or analysis. Request batch identification alongside the material datasheet.

Agree how identification will be preserved when stock is cut and parts are machined, heat-treated or finished elsewhere. Require records connecting incoming material, production lots, subcontracted operations and delivered parts.

Review the evidence before stock is consumed. Agree any independent testing, sampling and acceptance criteria in advance. Review material verification separately from visual and dimensional inspection, and check that the documents identify the material used for the delivered parts.

Evidence to request and the question it answers
EvidenceQuestion it helps answerRemaining check
Mill certificate or polymer batch documentWhat material and results are recorded for the identified batch?Does that batch match the stock actually used?
Stock receipt and cutting recordsHow was the incoming batch allocated to production?Was identity retained after stock was divided?
Heat-treatment or finishing recordsWhich process was applied to the production lot?Does the record meet the order's process and result requirements?
Part inspection reportWere the agreed dimensions and other listed characteristics checked?Were material verification and traceability checked separately where required?

What to put in your enquiry and purchase order

Send the part drawing and revision, intended use, destination market, quantity and required delivery date. State the material designation, governing standard and edition, applicable amendments, stock form, condition or formulation, finish and required documentation.

Require written approval before material substitution. Ask the quotation to disclose any alternative grade, unavailable stock or certificate limitation.

Agree a sample or first-part review before releasing the remaining production where appropriate. Include material documents in that review, alongside the finished part.

Use drawings and tolerances to send to China for the dimensional specification. Review material and drawing changes together and record both approvals.

If you sell in the US or EU

US entry — checked 18 October 2026: CBP states that the importer of record remains responsible for correct entry documentation and applicable duties, taxes and fees even when using a broker. Give the broker an accurate description of the part, material and use.

US tariffs — checked 18 October 2026: USTR publishes China Section 301 tariff actions and exclusion information. Have the applicable classification and current import measures checked for the actual goods; do not determine tariff treatment from a material name alone.

US food-contact uses — checked 18 October 2026: FDA guidance bases a food-contact material's regulatory status on its constituent substances and applicable regulatory provisions, including specifications and conditions of use. Request evidence for the supplied formulation and intended use rather than accepting a general 'FDA-approved material' claim.

EU CE marking — checked 18 October 2026: official EU guidance says CE marking is required only for products covered by harmonised EU rules that specifically mandate it, and must not be used where no such requirement exists. Assess the actual product and applicable requirements separately from material certification.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

UK example: customs value and import VAT

For a shipment to Great Britain, keep the part description, material specification, invoice and transport breakdown consistent. HMRC guidance checked on 18 October 2026 includes relevant delivery and insurance costs up to the applicable place of introduction in customs value. Ask the declarant to confirm that place and any required transport-cost apportionment for the shipping method.

HMRC's import VAT guidance, checked on 18 October 2026, starts with customs value and adds applicable import duties and other import charges excluding VAT itself, plus relevant incidental expenses to the first UK destination and a further UK destination known at importation. Ask the declarant to identify the additions and avoid counting costs already included.

This is a destination-specific example. For shipments elsewhere, obtain the destination authority's valuation and tax rules rather than applying the UK treatment.

Getting help with a material-specific sourcing brief

When commissioning sourcing help, provide the drawing, material requirements, supplier quotation, required certificates, proposed substitutions, quantity and destination.

Agree the scope and deliverables of any quotation review or small-order sourcing work before commissioning it.

Ask the written quotation to state whether factory checks, goods inspections, laboratory testing and third-party services are included, and agree any additional charges in advance.

Sources

The standards and authority sources below support the standards scopes and destination-specific guidance. Manufacturer and industry sources support the limited technical background; their product-specific information is not a guarantee for another supplier's stock. No cross-standard grade equivalence or current material-price ranking is asserted. The two retained NIST links could not be retrieved during this audit and were not relied on.

Frequently asked questions

Which CNC material should I ask a Chinese supplier to quote first?

Start with the material approved for the part's operating conditions. If the choice is still open, provide the load, environment, mating parts and finish requirements, then ask for clearly identified alternatives against the same drawing.

Can I replace 6061 with 7075 because it sounds stronger?

Do not approve the change on strength alone. Have the designer check the exact material condition, relevant properties, service environment and finishing requirements, then compare the complete quotation.

The supplier says its Chinese grade is equivalent. What should I ask for?

Ask for the proposed grade, governing standard, edition, applicable amendments, delivery condition and original mill certificate. Require a documented comparison with your specification and approve any substitution in writing.

Is 316 stainless always worth the extra cost over 304?

Choose using the actual exposure conditions and design requirements. Ask for separate quotations and supporting material evidence; neither a higher grade number nor a higher price establishes suitability for your application.

Can I order POM, ABS or PEEK just by the polymer name?

Specify the manufacturer and formulation, fillers or additives where relevant, colour, stock form and required properties. Agree how the supplied batch will be identified.

Does a material certificate prove the parts use the right material?

Check the link between the certificate, incoming stock and finished parts through heat or batch identification and production records. Agree testing where the available evidence does not establish the required properties.

Can I obtain traceable material for a small order?

Ask before ordering whether the supplier can allocate identified stock and provide the required documents. Require approval for substitutions and compare stock availability and documentation costs before accepting the quote.

Can a dimensional inspection replace material testing?

Do not use a dimensional report as evidence of untested material properties. Agree separate checks for composition, hardness or other properties where your specification requires them.

Sources

  1. SAMR: GB/T 3190-2020, chemical composition of wrought aluminium and aluminium alloys
  2. ISO: ISO 209:2024, wrought aluminium and aluminium alloys — chemical composition
  3. ISO: ISO 10474:2013, steel and steel products — inspection documents
  4. ISO: ISO 1043-1:2011, plastics — symbols and abbreviated terms
  5. NIST link supplied with the guide; retrieval unsuccessful, not relied on
  6. NIST link supplied with the guide; retrieval unsuccessful, not relied on
  7. FDA: determining the regulatory status of food-contact material components; checked 18 October 2026
  8. CBP: tips for new importers and exporters; checked 18 October 2026
  9. USTR: China Section 301 tariff actions and exclusions; checked 18 October 2026
  10. European Union: when CE marking applies; checked 18 October 2026
  11. HMRC: delivery costs included in customs value; checked 18 October 2026
  12. HMRC: calculating import VAT value from customs value; checked 18 October 2026
  13. Hydro: alloy 6061 datasheet, including temper-specific machining information
  14. Hydro: 7075 aluminium machining background
  15. Ensinger: machinable plastic stock shapes
  16. Ensinger: machining, material selection and traceability questions
  17. Copper Development Association: comparative machinability of brasses, steels and aluminium alloys
  18. Outokumpu: stainless steel corrosion mechanisms and service conditions

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote