Sourcing uPVC window frames from China

uPVC window frames from China carry 6% UK duty under 3925 20 00 00, with no trade remedy or suspension recorded. CE marking remains available for construction products placed on the Great Britain market. Check the conformity route for the exact product supplied. Cambridge China Bridge sources uPVC window frames.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-10-10

Illustrative image of uPVC window frames on a workshop surface.
Illustrative image

6% duty on uPVC window frames

Read from the UK Trade Tariff on 29 September 2026, heading 3925 covers builders' ware of plastics, not elsewhere specified or included. uPVC window frames fall within the line for doors, windows and their frames. The table separates buyer configurations sharing that line from plastic fittings intended for permanent installation.

The listed frame and fitting lines carry 6% duty for goods from China, with no anti-dumping or countervailing measure and no suspension recorded. The frame line also has an import control of fluorinated greenhouse gases. The supplied control note is incomplete: confirm the applicable declaration and supporting documents with your customs broker. Products containing banned fluorinated gases must not be placed on the Great Britain market.

Confirm the commodity code against the goods actually shipped, particularly when buying unfinished profiles, separate fittings or glazed assemblies. For the wider heading, see uPVC external doors.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 29 September 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
uPVC fixed-window frames3925 20 00 006%None
Plastic window fittings for permanent installation3925 90 10 006%None

Specify the frame and the finished window

State whether the order is for welded frames, frames with opening sashes, or complete glazed windows. Agree opening direction, overall dimensions and tolerances, profile cross-sections, reinforcement material and position, weld finish, drainage paths, gasket material, colour and foil finish. Identify glazing beads, cills, coupling profiles and hardware supplied separately.

CE marking continues to be available for construction products placed on the Great Britain market. Before ordering, establish the conformity route for the exact supplied product. Request its declaration of performance and supporting test reports; check that the profile, reinforcement, hardware and glazing configuration match your order. Agree the required thermal, air, water and wind performance with the project designer.

Worked duty example

Illustrative example, not a quote: 20 uPVC window frames, illustrative order under 3925 20 00 00, invoiced at £18,000 free on board, with £1,500 of freight and insurance to the UK. The customs value is £19,500. Duty at 6% is £1,170. Import VAT at 20% is charged on the customs value plus duty, £20,670, so it is £4,134. Import taxes total £5,304; a VAT-registered importer can usually reclaim the VAT, so the lasting cost is the £1,170 of duty. The import duty and VAT guide explains each step.

Inspection checklist

Geometry: measure overall dimensions and diagonals against the approved drawings; check squareness, straightness and weld corners.

Construction: check reinforcement against the agreed section and position, gasket continuity, drainage openings and glazing-bead fit.

Operation: where sashes and hardware are supplied, check opening, closing, locking, alignment and clearance without forcing the frame.

Arrival: inspect foil, surfaces and corners for transit damage; match frame identifiers to the opening schedule and packing list. Use an agreed inspection brief.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A frame can match the outside dimensions yet have the wrong opening direction, glazing rebate or cill connection. Missing reinforcement, distorted welded corners and blocked drainage can make installation or operation difficult. Protective film can conceal scratches, while unsupported stacking can distort frames during transport.

Approve a representative assembled sample and freeze the drawings before production. Reject undocumented substitutions to profiles, reinforcement, gaskets or hardware. A report for a different window configuration does not demonstrate the performance of your order; compare the report's specimen description with the supplied assembly.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on uPVC window frames from China?

The supplied tariff data records 6% under 3925 20 00 00, with no trade remedy or suspension, read on 29 September 2026.

Can CE-marked windows be supplied in Great Britain?

CE marking remains available for construction products in Great Britain. Check the conformity route and supporting evidence for the exact product supplied.

Does a frame order include glass and hardware?

Only if your specification includes them. List glazing, sashes, hinges, locks, handles, beads and cills expressly, and identify items packed separately.

Why does the tariff show a fluorinated-gas control?

The frame line carries that control. Ask your customs broker which declaration applies to your goods, and obtain material details for any foam-filled components.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Construction Products Regulation in Great Britain
  3. Bans on F gas in new products and equipment

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote