Sector guides

Sourcing travelling-wave tubes from China

Travelling-wave tubes and their parts from China carry 0% UK duty under the relevant lines of heading 8540, with no listed trade remedies. Distinguish components supplied between businesses from finished equipment when checking compliance for sale in Great Britain. Cambridge China Bridge sources travelling-wave tubes.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-11

Aisles of a large supermarket seen from above, shelves fully stocked

UK duty on travelling-wave tubes

Heading 8540 covers thermionic, cold cathode and photocathode valves and tubes. Travelling-wave tubes fall within the other microwave tubes line, 8540 79 00 90. The table shows different uses sharing that line, alongside the other parts line, 8540 99 00 90. For wider heading coverage, see our klystron tubes guide.

Read from the UK Trade Tariff on 2 October 2026, both relevant lines carried 0% duty for goods from China. The supplied tariff record lists no anti-dumping or countervailing duty, suspensions or attached import controls for these lines.

Confirm the commodity code using the manufacturer's datasheet and a description of what is shipped. Identify whether the order contains a tube, tube parts or an assembled amplifier. Budget separately for import VAT using our duty and VAT guide.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 2 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Travelling-wave tubes for continuous operation8540 79 00 900%None
Parts of travelling-wave tubes8540 99 00 900%None

Specify the tube and its operating conditions

Specify the manufacturer's type, intended equipment, frequency band, gain, output power and whether operation is continuous or pulsed. Agree the supply voltages, beam and heater requirements, input and output interfaces, mounting dimensions and cooling arrangements. Ask for performance records tied to the supplied serial number, with the test conditions stated.

Confirm whether the tube is new, unused stock or refurbished, and agree an acceptance test in the intended system. Component parts sold between businesses are outside the scope of the hazardous-substance regulations described in official Great Britain guidance. Components incorporated into an in-scope finished electrical product must support that product's compliance; obtain material declarations and details of any exemption relied upon.

Finished equipment must comply with all applicable legislation when placed on the Great Britain market. Identify the intended supply route before ordering and arrange a testing and certification review where the scope is unclear.

Worked duty example

Illustrative example, not a quote: Illustrative order: a replacement travelling-wave tube for a business test system under 8540 79 00 90, invoiced at £30,000 free on board, with £900 of freight and insurance to the UK. The customs value is £30,900. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £30,900, so it is £6,180. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Identity: compare the type, serial number and condition with the order, datasheet and individual test record.

Performance: check frequency coverage, gain and output against the agreed acceptance criteria using the specified supply, cooling and test load.

Interfaces: inspect connectors, waveguide faces, mounting surfaces and electrical terminals for damage and compatibility with the intended equipment.

Packing: check that the tube is restrained, interfaces are protected and cushioning prevents movement; record transit damage before installation.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A replacement can fit mechanically yet have the wrong frequency coverage, supply requirements or cooling arrangement. A headline output figure without test conditions can conceal performance that is unsuitable for the buyer's system. Refurbished tubes may also be supplied without an agreed condition statement or useful service history.

Make acceptance depend on the agreed operating conditions and traceable results. Check packing before dispatch and inspect on arrival before powering the tube. Use our quality inspection guide to set the inspection scope.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on travelling-wave tubes from China?

The supplied tariff record shows 0% for travelling-wave tubes under 8540 79 00 90 and other tube parts under 8540 99 00 90, with no listed trade remedies.

Can I buy a travelling-wave tube by its type number alone?

Use the type number as a starting point. Confirm frequency coverage, gain, output, supply requirements, cooling, mounting and interfaces against the intended equipment.

What test records should I ask the factory for?

Ask for results tied to the supplied serial number, covering the agreed frequency band, gain and output, with supply, cooling and load conditions stated.

Do component tubes need hazardous-substance compliance checks?

Official guidance excludes components sold between businesses from direct scope. Obtain material and exemption evidence to support compliance of the finished electrical product where it is in scope.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. RoHS Regulations: Great Britain guidance
  3. Electrical Equipment Safety Regulations: Great Britain guidance

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote