Sector guides

Sourcing rock-wool cavity batts from China

Rock-wool cavity batts from China carry 0% UK duty, with no anti-dumping or countervailing duty in the supplied tariff record. Confirm declaration-of-performance and CE or UKCA marking requirements for the building insulation with the relevant construction-product authority, with evidence matching the supplied product. Cambridge China Bridge sources rock-wool cavity batts.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-12

Aisles of a large supermarket seen from above, shelves fully stocked

UK duty on rock-wool cavity batts

Read from the UK Trade Tariff on 1 October 2026, heading 6806 covers mineral wools and other insulating mineral materials. Rock-wool cavity batts supplied as mineral-wool sheets fall within 6806 10 00 00. The listed batt forms share this commodity line. Chinese-origin goods carry 0% duty, with no anti-dumping or countervailing measure and no suspension recorded.

The tariff attaches waste import and export controls to this line. For waste subject to notification controls entering England from China, the exporter must apply to the competent authority in China for consent. Ask your customs broker to confirm whether the shipment is waste and which requirements apply before dispatch.

Confirm the material, product form and any facing with your broker using finding your commodity code. For another product family within the heading, see rock-wool pipe insulation sections.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Unfaced rock-wool cavity batts6806 10 00 000%None

Specify the cavity application and batt performance

State whether the batts are intended for full or partial cavity fill. Agree length, width, recovered thickness, density, edge profile, facing and packaging compression. Ask for installation details showing how the proposed batt fits around wall ties and openings. Have the project specifier approve the intended application rather than selecting solely by density.

Confirm declaration-of-performance and CE or UKCA marking requirements for building mineral-wool insulation with the relevant construction-product authority. CE marking remains available for construction products placed on the Great Britain market. Obtain thermal conductivity and reaction-to-fire reports matching the exact batt, including its facing. Ask for the safety data sheet and fibre bio-solubility evidence supporting exemption from carcinogen classification. Arrange testing and certification checks before shipment.

Worked duty example

Illustrative example, not a quote: An illustrative container of rock-wool cavity batts; values are hypothetical under 6806 10 00 00, invoiced at £12,000 free on board, with £4,000 of freight and insurance to the UK. The customs value is £16,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £16,000, so it is £3,200. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Dimensions: measure sampled batts after unpacking and compare recovered thickness, width and edge squareness with the agreed specification.

Condition: check for wet packs, staining, crushed corners, persistent compression and excessive crumbling.

Fit: compare sampled batts with the approved installation details, including joints, wall ties and cut edges.

Documents: match pack labels and batch identities to the declaration of performance and thermal and fire reports. Use the quality inspection guide to agree inspection scope.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

Batts that stay compressed or arrive with damaged edges can leave gaps when fitted. Incorrect dimensions create extra cutting and poor joints. Wet packs and uneven binder distribution can leave material unsuitable for the agreed application. Record defects before accepting the delivery.

A report for another density, facing or product type does not demonstrate the supplied batt's declared performance. A generic insulation certificate also leaves the cavity application unresolved. Agree the product identity, supporting reports and installation details before production, then compare them with the delivered goods.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on rock-wool cavity batts from China?

The supplied tariff record shows 0% duty under 6806 10 00 00, with no anti-dumping or countervailing duty and no suspension recorded.

Can CE-marked rock-wool cavity batts be sold in Great Britain?

CE marking remains available for construction products in Great Britain. Obtain the declaration of performance and reports for the exact batt, rather than relying on a logo alone.

Can I choose cavity batts by density alone?

Compare declared thermal conductivity, recovered thickness, fire performance and installation details. Ask the project specifier to approve the batt for full or partial cavity fill.

Does the tariff waste control apply to new cavity batts?

The tariff attaches a waste control to the commodity line. Ask your broker to confirm the shipment's waste status and applicable requirements; do not infer these from the code alone.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Construction Products Regulation in Great Britain
  3. Waste: export and import

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote