Sector guides

Sourcing replacement frame bridges from China

Replacement spectacle frame bridges from China carry 0% UK duty across the relevant parts lines. Confirm any applicable UK REACH nickel release restrictions for metal bridges in prolonged skin contact with the relevant authority. Check the intended repair use and compatibility before ordering. Cambridge China Bridge sources replacement spectacle frame bridges.

Buying from China for a business? How our UK China sourcing agent service works · China sourcing agent for small orders and first imports

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-21

Illustrative studio view of replacement frame bridges, showing the product's external form and material on a pale grey surface.
Illustrative image

Replacement bridge duty and classification

Read from the UK Trade Tariff on 1 October 2026, heading 9003 covers spectacle frames, mountings and their parts. Separate replacement bridges belong within the parts descriptions: the titanium-alloy line or the other-parts line, subject to confirmation of the material and finished condition. The table lists bridge variants sharing these codes. The replacement temples guide gives related heading context.

Both relevant parts lines carry 0% duty on goods from China. The supplied tariff record lists no anti-dumping or countervailing duty and no suspensions. It attaches CITES import and export controls to both lines, and a supplementary unit import control to the titanium-alloy line. The importer should confirm the supplementary declaration requirement with their customs broker.

For bridges containing CITES-listed animal or plant material, confirm the species and permit requirements with the Animal and Plant Health Agency and the Chinese management authority before shipment. CITES controls include items made from parts or derivatives of listed species. Confirm the commodity code using the bridge drawing, material declaration and description of how it attaches to the frame.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Titanium-alloy replacement spectacle frame bridges9003 90 00 200%None
Steel replacement spectacle frame bridges9003 90 00 900%None

Specify the bridge and its repair function

Identify the frame model and whether the bridge screws on, clips in or needs soldering or welding. Specify the span, curvature, cross-section, attachment positions, thread details and finish against a drawing and an approved sample. Agree whether screws or other fittings are included. Trial-fit the bridge on the actual frame rather than judging compatibility from photographs.

MHRA guidance says replacement parts for an already UKCA-marked device are not usually medical devices unless they significantly change its characteristics or performance. Document whether the bridge restores the original fit and function. If its shape or attachment changes the frame's performance, resolve its regulatory status before ordering.

Specify the alloy or plastic and any coating separately. Confirm any applicable UK REACH nickel release restrictions for metal parts in prolonged skin contact with the relevant authority. Ask for reports covering the supplied material and finish, and agree assembled-frame checks for bridge deformation and resistance to perspiration. Use testing and certification support to define the evidence needed.

Worked duty example

Illustrative example, not a quote: 10,000 steel replacement spectacle frame bridges, illustrative only under 9003 90 00 90, invoiced at £10,000 free on board, with £1,500 of freight and insurance to the UK. The customs value is £11,500. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £11,500, so it is £2,300. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Fit: on arrival, compare the bridge span, curve and attachment positions with the approved drawing, then trial-fit samples to the nominated frame without forcing the rims apart.

Attachment: check screw engagement, seating and clip retention where applicable; for soldered or welded repairs, check that the supplied material matches the agreed joining process.

Material and finish: verify the declared alloy or plastic, inspect contact surfaces for burrs and scratches, and match nickel release reports to the supplied metal and coating.

Packing and identification: check model and finish labels, included fittings, quantities and separation of similar-looking bridges; inspect for distortion caused by loose packing.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A bridge can look correct but have the wrong curvature or attachment spacing. Forcing it into place can distort the rims and alter how the frame sits. Threads may bind, clips may not seat, and a visually similar alloy may behave differently during soldering or welding.

Plating can hide a material substitution or leave rough edges at the nose contact area. Keep an approved sample for each frame model and finish, record trial-fit results, and agree how incompatible or damaged parts will be separated from usable stock.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on replacement spectacle frame bridges from China?

The relevant parts lines, 9003 90 00 20 and 9003 90 00 90, carry 0% duty from China. The supplied tariff record lists no anti-dumping or countervailing duty.

Do replacement spectacle frame bridges need UKCA marking?

MHRA says spare parts for an already UKCA-marked device are not usually medical devices unless they significantly change its characteristics or performance. Confirm the bridge's intended function.

How do I check a replacement bridge fits?

Compare its span, curvature, attachment spacing and threads with the approved drawing. Trial-fit it to the specified frame and check alignment without forcing the rims.

Do metal replacement bridges need nickel testing?

Ask for a test report covering the actual alloy and coating supplied.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Borderlines with medical devices and other products in Great Britain
  3. Check if you need a CITES permit to import or export endangered species

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote