Sector guides

Sourcing prepayment electricity meters from China

Prepayment electricity meters from China carry 0% UK duty across the relevant electricity-meter lines. Confirm conformity assessment and metrology marking requirements for regulated uses with the relevant authority; a type approval certificate alone is insufficient for billing under the Measuring Instruments Regulations. Cambridge China Bridge sources prepayment electricity meters.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-10-31

Aisles of a large supermarket seen from above, shelves fully stocked

Duty on prepayment electricity meters

Heading 9028 covers electricity supply or production meters and their parts, alongside gas and liquid meters. For prepayment electricity meters, distinguish single-phase alternating-current models, multiphase models and other electricity meters. Prepayment describes the payment function; specify the electrical configuration when checking classification.

Read from the UK Trade Tariff on 1 October 2026, all the selected electricity-meter and electricity-meter parts lines carry 0% duty for goods from China. The supplied tariff record lists no anti-dumping or countervailing duties, suspensions or attached import controls for these lines. Import VAT is separate from customs duty.

Confirm the commodity code using the meter specification and whether the shipment contains complete meters or separately supplied parts. See the wider meters guide for gas and liquid meters.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Single-phase alternating-current electricity meters9028 30 11 000%None
Multiphase alternating-current electricity meters9028 30 19 000%None
Other electricity meters9028 30 90 000%None
Parts and accessories for electricity meters9028 90 10 000%None

Specify the credit system and approval scope

State whether the meter is for supplier billing, landlord sub-metering or internal monitoring. For uses covered by the Measuring Instruments Regulations, confirm the applicable conformity assessment and conformity and metrology marking requirements with the relevant authority. Under those regulations, a type approval certificate alone does not approve an electricity meter for supplier or landlord billing.

Agree the phase configuration, voltage, current range, accuracy class, mounting, terminals and display language. Specify the top-up method, vending-system compatibility, credit units, tariff settings, emergency-credit behaviour and disconnection and reconnection sequence. Test the meter with the actual vending system before approving the sample.

Ask what happens to the balance and settings after a power interruption. Agree access permissions for tariff changes, tamper-event recording and replacement-meter setup. For supplier-installed smart meters, confirm with the relevant authority which government smart metering equipment specifications apply; settle the target specification before sampling.

Worked duty example

Illustrative example, not a quote: Illustrative batch of single-phase prepayment electricity meters for a property business under 9028 30 11 00, invoiced at £45,000 free on board, with £2,000 of freight and insurance to the UK. The customs value is £47,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £47,000, so it is £9,400. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Documents and identity: match model, accuracy class, serial numbers and applicable conformity and metrology markings to the approval documents. Check that the evidence covers more than type examination alone.

Measurement: test sampled meters on a calibrated bench at several loads and power factors, including starting current and no-load creep. Compare results with the agreed accuracy class.

Credit handling: load credit through the intended vending system, consume it under controlled conditions and check the displayed balance. Test rejected and reused top-ups, exhausted credit, emergency credit and recovery after power loss.

Construction and arrival: check terminal security, enclosure damage, display readability, seals and tamper detection. Compare delivered hardware and firmware with the approved sample and record discrepancies during inspection.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

A meter can measure electricity correctly yet fail the buyer's payment workflow. Risks to test include incompatible top-up tokens, incorrect tariff settings, lost balances after power interruption and a relay that reconnects unexpectedly. Make the acceptance demonstration cover the complete credit cycle.

Another problem is treating a type approval certificate as complete billing approval. Check the full conformity evidence against the delivered model before release. Electrical accuracy, credit arithmetic and tamper protection need separate checks; a working display does not establish that they all pass.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For components and parts, see sourcing for manufacturers.

Frequently asked questions

What is the UK import duty on prepayment electricity meters from China?

The relevant electricity-meter and electricity-meter parts lines carry 0% duty. The supplied tariff record lists no anti-dumping or countervailing duty, suspension or attached import control.

Is a type approval certificate enough for a landlord's prepayment meter?

Under the Measuring Instruments Regulations, type approval alone does not approve an electricity meter for landlord-tenant billing. Check the complete conformity assessment evidence.

Will a Chinese prepayment meter work with our top-up system?

Do not assume compatibility. Give the factory your vending-system specification and test credit loading, rejected or reused top-ups, tariff changes and reconnection with the actual system.

What should we test before accepting the shipment?

Check approval documents, markings, accuracy, starting current, no-load creep, seals and terminals. Also test credit deductions, balance retention after power loss and disconnection and reconnection behaviour.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Measuring Instruments Regulations: Great Britain guidance
  3. MIR approved gas and electricity meters

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote