Ceramic fibre modules assessed under heading 6806 carry 0% UK duty from China, with no trade remedies shown. Confirm the code for the finished module, control fibre dust during handling and installation, and check fibre composition before resale. Cambridge China Bridge sources ceramic fibre modules.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-11-08

Aisles of a large supermarket seen from above, shelves fully stocked

Ceramic fibre module duty and waste controls

Heading 6806 covers mineral insulating materials and articles. For prepared ceramic fibre modules, assess the other-articles line, 6806 90 00 00, against the actual composition and construction. The table shows module variants against this same candidate line, not separate tariff subheadings. For the wider product family, see ceramic fibre blankets.

Read from the UK Trade Tariff on 1 October 2026, all supplied lines of heading 6806 carried 0% duty for goods from China. The snapshot lists no anti-dumping or countervailing duty and no suspensions. The candidate module line carries import and export waste controls.

For used or recovered modules from China, ask your customs broker and the relevant environmental regulator to confirm whether waste controls apply and which procedure is required. Waste shipped under notification requires consent from the authorities of dispatch, destination and transit before movement. Confirm the finished module's commodity code before ordering.

UK duty on these lines for goods of Chinese origin (one code per row), read from the UK Trade Tariff on 1 October 2026.
GoodsCommodity codeDutyAnti-dumping or countervailing duty on China
Folded ceramic fibre modules for furnace walls6806 90 00 000%None

Fibre grade, module compression and anchoring

Specify fibre chemistry, module dimensions, compressed density, fold direction and the required installed thickness. Give the supplier the furnace operating conditions, atmosphere and lining drawing. Ask for shrinkage and thermal performance reports for the proposed fibre grade under stated test conditions. Agree the anchor material, fixing position, installation tool access and joint arrangement with the lining designer.

HSE advises avoiding inhalation of ceramic fibre dust and skin contact. Where harmful exposure cannot be eliminated, adequate controls must reduce it. Ask for handling instructions and product safety information before approving samples, and plan how modules will be unpacked, trimmed and installed.

Check the declared fibre composition against the UK REACH Candidate List before resale in Great Britain. Inclusion on that list brings supplier obligations; ask a compliance adviser to assess the actual finished module. Arrange testing and certification support where the supplier's evidence needs checking.

Worked duty example

Illustrative example, not a quote: Illustrative palletised batch of ceramic fibre modules for a furnace relining contractor under 6806 90 00 00, invoiced at £12,000 free on board, with £4,000 of freight and insurance to the UK. The customs value is £16,000. Duty at 0% is £0. Import VAT at 20% is charged on the customs value plus duty, £16,000, so it is £3,200. With no duty, the only import tax is the VAT, which a VAT-registered importer can usually reclaim. The import duty and VAT guide explains each step.

Inspection checklist

Dimensions: check length, width, thickness, squareness and fold direction against the approved drawing while retaining the agreed shipping compression.

Density and recovery: check sample mass and dimensions against the agreed compressed density, then check expansion and joint closure using the supplier's installation method.

Anchors: check material records, position, attachment security and access for the installation tool; trial-fit a sample against the lining drawing.

Packing and records: check for wet packaging, torn wrapping, damaged edges and loose fibres; match batch labels to the order and test reports. Include these checks in the inspection brief.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

What goes wrong

Modules can arrive with the right outer dimensions but insufficient fibre mass or uneven compression. They then recover unevenly during installation and leave open joints. A temperature grade quoted without matching shrinkage evidence can also hide an unsuitable fibre specification.

Misplaced anchors obstruct the installation tool, weak attachments loosen during handling, and damaged wrapping allows contamination or moisture into the fibre. Approve a trial assembly, retain a reference module and agree how compression restraints are removed before shipment.

Cambridge China Bridge sources these products for UK businesses, checking the factory and the documents before shipment. See factory verification. For repeat volumes, see container programmes.

Frequently asked questions

What is the UK import duty on ceramic fibre modules from China?

The supplied tariff snapshot shows 0% duty under the candidate code 6806 90 00 00, with no anti-dumping or countervailing duty. Confirm classification for the finished module.

What should I specify for ceramic fibre modules?

Specify fibre chemistry, dimensions, compressed density, fold direction, installed thickness, shrinkage evidence and anchor details. Provide the furnace conditions and lining drawing.

How should ceramic fibre modules be handled?

HSE advises avoiding inhalation of fibre dust and skin contact. Obtain product safety information and agree controls for unpacking, trimming and installation before handling samples.

Is import VAT payable when duty is zero?

Allow for 20% import VAT in the illustrative costing. See UK import duty and VAT for the calculation method.

Sources

  1. UK Trade Tariff — commodity codes and duty
  2. Waste: export and import
  3. Kilns in schools and craft studios
  4. How to carry out a COSHH risk assessment
  5. UK REACH substances of very high concern

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote