Getting started

Forecast repeat China orders after stockouts

Calculate selling rates only over comparable periods when customers could actually buy the product. Keep unavailable periods separate, estimate missed demand cautiously and record a forecast range with its assumptions. Turn that forecast into an approved replenishment plan with Cambridge China Bridge.

Written by Bono Xu, Founder, Cambridge China Bridge · 3 min read · Updated 2026-10-10

Illustrative image of Forecast repeat China orders after stockouts on a workshop surface.
Illustrative image

Rebuild the availability record

Keep a record by product variant and sales channel, showing units sold, sellable stock, availability dates, price and promotions. Record when customers could actually order, rather than relying only on warehouse balances. Stock reserved for other customers, quarantined goods and an inactive listing may all prevent sales.

Label each period as available, unavailable, partly available or unknown. Split periods at stockout and restocking times where records allow. Keep genuine no-sale periods when the product was available; flag missing availability records as unknown rather than treating them as evidence of absent demand.

Calculate a comparable in-stock selling rate

Divide units sold during confirmed available periods by the selling time covered by those periods. Use the same time unit throughout. If stock ran out during a trading day, use the available part where known; otherwise flag that day as partial instead of counting it as fully available.

Compare like with like: the same variant, channel, season, price and promotion conditions. Keep promotion sales and post-restock backlog clearances separate from ordinary selling. A brief available spell during peak demand is a weak basis for forecasting the whole season.

Estimate missed demand without rewriting sales

Keep actual sales unchanged. In a separate estimate field, apply a comparable in-stock rate to unavailable selling time. Label the result as estimated missed demand, with the source period and assumptions. If there is no credible comparison, record demand as unknown rather than inserting a confident replacement.

Use backorders, cancelled orders, enquiries and restock requests to challenge the estimate. Deduplicate customer records and separate outstanding orders from abandoned purchases. Check whether buyers switched to another product in your range; adding estimated lost demand to substitute sales can overstate total demand.

Keep observations and estimates separate
RecordWhat to retainHow to use it
Actual salesRecorded sales and the availability statusPreserve the original trading record
In-stock rateComparable selling periods and exclusionsBuild the demand baseline
Missed-demand estimateMethod, comparison period and assumptionsExplore demand hidden by stockouts
UncertaintyMissing records and alternative explanationsSet scenarios and review triggers

Record a range and test it after restocking

Write lower, central and higher demand scenarios, explaining what changes between them. Include uncertainty about availability, seasonality, customer substitution and promotional activity. These are planning scenarios, not statistical confidence limits unless a suitable model supports that description.

Save the forecast before new sales arrive. Compare it with later periods of confirmed availability and comparable trading conditions, keeping backlog clearances separate. If another stockout occurs, flag the comparison as constrained by availability rather than concluding that low sales prove the forecast was too high.

Working out your own order? Send us the product on WhatsApp and we reply the same working day: WhatsApp us

Turn the forecast into a repeat-order brief

Project demand across the replenishment period using dates confirmed for production, checks, transport and warehouse receipt. Deduct usable stock and confirmed incoming goods, and account for customer commitments without counting them again in forecast demand. Use the reorder-point guide for the replenishment decision. For repeat-order checks, see monitoring product rule changes. For component orders, see our guide to turning forecasts into component buying plans.

Send the forecast range, availability record, assumptions and review trigger to Cambridge China Bridge. Our staff in China can discuss factory capacity and batch options against your brief. Keep the forecast and firm purchase order distinct, and use the supplier call-off guide when agreeing release arrangements.

Frequently asked questions

Should I include stockout days in average sales?

Exclude unavailable selling time from the in-stock rate. Retain stockout periods separately so you can estimate missed demand and show uncertainty.

What if I do not know when stock ran out?

Mark availability as unknown. Check stock movements, listing records and order timestamps. Use comparable confirmed in-stock periods cautiously and document the gap.

Can I count backorders as lost sales?

Keep outstanding backorders separate from abandoned purchases. They can inform demand, but counting them again when fulfilled would inflate the record.

How do I forecast a product that is often out of stock?

Use comparable available periods and customer-request evidence, with a wider documented range where evidence is weak. Review after restocking before increasing factory commitments.

Monthly email

What changed for UK buyers from China, and when to act

One email at the start of each month. Every figure has an official source.

One email a month. Unsubscribe with one click. Privacy

Discuss your sourcing project

Tell us the product, quantity and destination. Our own staff in China verify factories, follow production and inspect before shipment. We reply the same working day to confirm receipt and arrange next steps.

Discuss your sourcing project
Get a quote