Factory profile · Light machinery
Power-trowel and concrete-equipment manufacturer, Ningbo
A factory we know from our own supplier work. We do not publish its name; ask us and we will introduce you.
Compiled from the cited sources on 27 October 2026. Not an endorsement.
Facts with sources
Figures, certificates, markets and the company type are what the company says about itself. We have not seen the certificates or the factory.
| Fact | What the source says | Source |
|---|---|---|
| City and province | Ningbo, Zhejiang | [2] |
| Company type | Manufacturer(self-described) | [2] |
| Main products | Concrete vibrators and shafts; Plate compactors; Rammers; Walk-behind power trowels; Ride-on power trowels; Concrete cutters; Screeds(claimed by the company) | [1] |
| What the company told us | The company says it offers 24-inch and 75 cm power trowels with fixed or in-use adjustable blade pitch and an extension rod that can be removed for shipping. Its platform listing gives a lead time of about 25 days.(claimed by the company) | [1][3] |
| Certificates | EU Machinery Directive certificate for a power trowel(claimed by the company) | [1] |
| Size band | Small: About 2 staff on the social-insurance register; the company's platform profile says about 200–300 staff and a factory of about 5,000–10,000 m² | — |
| CCB verification | Profile compiled from 3 cited sources, last reviewed 27 October 2026 · CCB Verification Standard | — |
Thinking of ordering from this factory?
Get it checked before you pay — desk check from £195 + VAT, report in 3 working days.
Plus VAT, paid before the check starts. The price for your supplier is confirmed before you pay. A supplier check is usually included in the quote when you order goods through us.
We send the report within 3 working days of payment. The check starts once payment arrives; if the supplier is slow to send its documents, we tell you and the 3 days count from when they arrive.
Ask for a supplier checkSources
- Alibaba.com company page: Company's supplier-platform profile and a power-trowel listing(address withheld so the factory is not named)(read 27 October 2026)
- Business-register record read by Cambridge China Bridge: Business-register record, read by CCB through a data aggregator (not yet confirmed on the national register)(address withheld so the factory is not named)(read 27 October 2026)
- Information the company gave Cambridge China Bridge: Company's messages to CCB (unverified)(address withheld so the factory is not named)(read 27 October 2026)
Thinking of buying from this factory?
We are a UK company with our own staff in China. We check the factory, get you a delivered UK price, and stay accountable for the order.
Buying guides for this product
- Sourcing concrete vibrators from China
- Sourcing construction diesel engines from China
- How to prepare a Declaration of Performance
How we can help
Last reviewed 27 October 2026 · Are you this company, or is something here out of date? Tell us and we will correct it.
Thinking of ordering from this factory?
Get it checked before you pay — desk check from £195 + VAT, report in 3 working days.
Plus VAT, paid before the check starts. The price for your supplier is confirmed before you pay. A supplier check is usually included in the quote when you order goods through us.
We send the report within 3 working days of payment. The check starts once payment arrives; if the supplier is slow to send its documents, we tell you and the 3 days count from when they arrive.
Ask for a supplier check