Sectors

Sourcing floor tiles, sanitaryware and PVC pipes from China by the container

For tiles, sanitaryware and PVC pipes from China, write the grade, size, shade and calibre, glaze and fittings, and the pipe standard and pressure class into the order, then check shade lots, breakage and piece counts before loading. Our own staff in China inspect and count at the factory, and we quote to the UK or to your own port.

Written by Bono Xu, Founder, Cambridge China Bridge · 4 min read · Updated 2026-09-23

For building-materials distributors in the UK and overseas: specify grade, shade and calibre, check counts before loading and get the right papers.

Products and search terms

floor tiles, porcelain tiles, ceramic tiles, sanitary ware, sanitaryware, PVC pipes, building materials

Aisles of a large supermarket seen from above, shelves fully stocked

Wrong grades and short shipments start at the order

Most disputes with building-materials suppliers come from an order that never fixed the grade. A tile quote that says 60 by 60 porcelain does not say which grade, which shade lot or which calibre, and a factory can ship any of them against it. Write every one of those into the order and the proforma invoice, with the approved sample referenced by number.

Short shipments are a counting problem. Agree the count per pallet and per carton, and have the goods counted at the factory before the container is sealed, not at the port after it opens. Our own staff in China do that count and send the loading record with photographs and the seal number.

What to fix in the order for each product family.
ProductSpecifyCheck before loading
Floor and wall tilesBody type, size, thickness, surface finish, grade, shade and calibre, rectified or not, and any slip or water-absorption claim with its testShade lot and calibre against the approved sample, chipped edges, and count per pallet
SanitarywareModel, glaze colour, fixing points, fittings supplied and any flush or water-use claim with its testGlaze defects, cracks, fittings in the box and fit with the stated seat or cistern
PVC pipes and fittingsThe pipe standard, size, wall thickness, pressure class, colour and markingPrinted marking, measured wall thickness on sampled pipes and bundle counts
PackingCrates, pallets, corner protection, carton marks by model and shade lotPacked pallets opened, marks matching the packing list

Heavy goods fill a container by weight

Tiles and sanitaryware usually reach a container's weight limit before its volume, so a quote per container depends on the weight per box as much as the price per square metre. Ask each factory for the packed weight and the quantity it proposes to load, and compare quotes on that basis.

Mixing products in one container is common for a distributor. Agree which factory delivers to which consolidation warehouse and when, and keep shade lots separate on the packing list so that one project's floor does not arrive in two colours. The container loading check sets out what the report shows.

Papers for the UK and for your own market

In Great Britain, construction products covered by a designated standard or a UK technical assessment must carry the UK marking, and the manufacturer must produce a declaration of performance whose reference number appears with the marking. Importers put their own name and address on the product and check that the manufacturer has done its part. Ask the factory for the declaration and the test basis before you order.

For other markets, the destination rules come first. We quote to your own port, a Chinese port or ex-works, and your importer and customs broker handle the entry at your end. The country guides, such as Nigeria, set out the certificates that have to be arranged in China before shipping, which is the part we handle with the factory.

Frequently asked questions

How do I stop receiving the wrong tile grade from China?

Write grade, shade lot and calibre into the order against a numbered approved sample, and have them checked at the factory before the container is sealed.

How can I prevent short shipments of building materials?

Agree counts per carton and pallet, and have the goods counted and photographed at loading with the seal number recorded, before you release the balance payment.

Do you ship building materials outside the UK?

Yes. We quote to your own port, a Chinese port or ex-works, and manage the factory checks, counting and loading in China.

Sources

  1. GOV.UK — Construction Products Regulation in Great Britain

Find your hidden margin

For UK delivery, send a link or specification for an off-the-shelf product and we can return a free landed-price comparison within 72 hours, whether or not you buy it today. If you buy it already, tell us your current price. Custom products take about three weeks to quote; overseas delivery and standalone audits are scoped separately.

Start my free comparison
Free price comparison